Manuals
/
Regency
/
Household Appliance
/
Indoor Fireplace
Regency
P33-LP4 installation manual Parts List
Models:
P33-LP4
1
47
52
52
Download
52 pages
40.32 Kb
44
45
46
47
48
49
50
51
<
>
Install
Parts list
Vent Termination Locations Section Diagram
Log Replacement
Warranty
Maintenance
Ignitor Wire Piezo Ignitor
Top Standoff Assembly
Lighting Procedure
This allows for small adjustments
Page 47
Image 47
PARTS LIST
Regency
®
P33-4
Zero Clearance Direct Vent Gas Fireplace
47
Page 46
Page 48
Page 47
Image 47
Page 46
Page 48
Contents
Owners
Installation Manual
P33-4Zero Clearance
Direct Vent Gas Fireplace
To the New Owner
WARRANTY
TABLE OF CONTENTS
MAINTENANCE
PARTS LIST
SAFETY LABEL
SAFETY LABEL
OBSTRUCTIONS
REQUIREMENTS
MA Code - CO Detector
5.08 Modifications to NFPA-54,Chapter
BEFORE YOU START
INSTALLATION
GENERAL SAFETY INFORMATION
IMPORTANT MESSAGE
Vent Termination Locations Section Diagram
INSTALLATION
INSTALLATION CHECKLIST
UNIT DIMENSIONS
COMBUSTIBLE MANTELS
INSTALLATION
CLEARANCES
MANTEL LEG CLEARANCES
Minimum Clearances
INSTALLATION
FRAMING AND FINISHING
Rigid Vent
VENTING INTRODUCTION
INSTALLATION
UNIT ASSEMBLY PRIOR TO INSTALLATION
Top Standoff Assembly
EXTERIOR VENT TERMINATION LOCATIONS
INSTALLATION
MINIMUM FLEX KIT CENTER-LINE
INSTALLATION
REGENCY DIRECT VENT FLEX SYSTEM
MINIMUM RIGID PIPE CENTER-LINE
INSTALLATION PROCEDURES
INSTALLATION
Caps
INSTALLATION
RIGID PIPE VENTING SYSTEMS
Alternate
4” X 6-5/8”RIGID PIPE CROSS REFERENCE CHART
INSTALLATION
Offset Pipe Selection
INSTALLATION
4” x 6-5/8”Rigid Pipe Cross Reference Chart Cont
Vent must be supported at offsets
INSTALLATION
RIGID PIPE VENTING ARRANGEMENTS
Vertical Terminations Propane & Natural Gas
Maintain clearances to combustibles
INSTALLATION
The P33-4is approved for a maximum 40 ft. straight vertical, with rigid pipe vent systems for Propane and Natural Gas
Vent must be supported at offsets
Minimum Simpson Dura-Vent Center-Line
INSTALLATION
RIGID PIPE VENTING ARRANGEMENTS
REGENCY DIRECT VENT SYSTEM FLEX
Horizontal Venting with Two 2 90o Elbows
INSTALLATION
Horizontal Venting with Two 2 90o Elbows
Horizontal Venting with Three 3 90o Elbows
Vertical Venting with Two 2 90o Elbows
INSTALLATION
Horizontal Venting with Three 3 90o Elbows
Vertical Venting with Two 2 90o Elbows
Option
INSTALLATION
Vertical Venting with Three 3 90o Elbows
Vertical Venting with Three 3 90o Elbows
Amaximum of two certified joiner kits
INSTALLATION
VERTICAL TERMINATION WITH CO-LINEARFLEX SYSTEM
Co-linearDV Vertical Termination Cap #
VerticalHeightfeet
INSTALLATION
The shaded area in the diagrams show
VENTING ARRANGEMENTS - VERTICAL TERMINATIONS
Diagram
INSTALLATION
UNIT INSTALLATION WITH HORIZONTAL TERMINATION
Diagram
Diagram
INSTALLATION
UNIT INSTALLATION WITH VERTICAL TERMINATION
GAS LINE INSTALLATION
HIGH ELEVATION
INSTALLATION
PILOT ADJUSTMENT
GAS PIPE PRESSURE TESTING
Assembly to the left and lift out
INSTALLATION
For P33-4/H25-1Using SIT 820 NOVA Gas Valve
Installation of the LPG Conversion Kit
Also check that the pilot and
INSTALLATION
Do not overtighten the screw. Recommended to grip
the wrench by the short side
Battery Compartment
INSTALLATION
Ignitor Wire Piezo Ignitor
Ground wire from kit
PANELS
INSTALLATION
LOG SET INSTALLATION
OPTIONAL BRICK
STANDARD FLUSH DOOR
INSTALLATION
Diagram Diagram
Diagram
FLUSH LOUVERS
INSTALLATION
Diagram
Clip locations Clip installed on right side
Bay Louver Top Heat Shield
INSTALLATION
BAY LOUVERS
Flush Louver Top Heat Shield
Cut-Out Oblong Hole Cut-Out Top Flange Bottom
INSTALLATION
FULL SCREEN DOORS
Backside of FullFlange Screen Door Frame Shown
Left Side of Bottom Grill Screen Door
INSTALLATION
Hinge Location Bottom Grill
Hinge
Do not wire millivolt wall switch wire
INSTALLATION
Optional REMOTE CONTROL
Optional WALL SWITCH
WIRING DIAGRAMS
INSTALLATION
INSTALLATION
Diagram
INSTALLATION
INSTALLING THE OPTIONAL FAN
1 Shut the power off
Gas Inlet
OPERATING INSTRUCTIONS
COPY OF THE LIGHTING PLATE INSTRUCTIONS
CLEAN THE GLASS WHILE IT IS HOT
LIGHTING PROCEDURE
SHUTDOWN PROCEDURE
AERATION ADJUSTMENT
MAINTENANCE
MAINTENANCE
MAINTENANCE
LOG REPLACEMENT
THERMOPILE THERMOCOUPLE
MAINTENANCE
Flush Glass Replacement
Bay Glass Replacement
Diagram 2 Rear Log Stand & Valve Tray Assembly
MAINTENANCE
INSTALLING VALVE
Diagram 3 Lift out Valve Tray Assembly
MAIN ASSEMBLY
PARTS LIST
PARTS LIST
Part Description
PARTS LIST
BURNER & LOG ASSEMBLY
FLUSH FRONT & LOUVERS
PARTS LIST
BAY FRONT & LOUVERS
PARTS LIST
Exclusions
WARRANTY
Conditions
thoroughly before it leaves our door