MAINTENANCE
REMOVING VALVE
1)Shut off the gas supply.
2)Remove the louvers (and bay door if it is on).
3)Open the flush door and remove the door.
4)Remove the logs.
5)Remove the burner/grate assembly by re- moving the two Phillips head screws and then lift the burner assembly out.
gram 2) and then lift the entire assembly out (diagram 3).
10)Undo the pilot tube from the valve with a 7/16" wrench.
INSTALLING VALVE
1) | Attach the valve to the valve bracket with |
| the 4 (m5x8 metric) screws provided. |
2) | Reconnect the "gas out" flare fitting with |
| an 11/16" wrench. |
3) | Reconnect the "gas out" flare nut with a 13/ |
| 16" wrench. |
4) | Install piezo ignitor push button assembly |
| and reconnect wire. |
5) | Reconnect the quick drop out thermocou- |
| ple nut with a 9mm wrench. |
Diagram 3: Lift out Valve Tray Assembly
6) Reconnect the pilot tube nut with a 7/16" |
wrench. |
7) Scrape off the old gasket from the floor of the firebox and from the valve tray assem- bly.
8)Install a new gasket and reinstall the valve tray assembly.
Diagram 1: Remove the left and right screws and then lift out the burner/grate assembly.
6)Remove the rear log stand by removing the 2 screws.
7)Disconnect the inlet gas line. See diagram 2.
8)Disconnect the 2 TP wires and the 2 TH wires from the valve.
9)Remove the 10 Phillips head screws secur- ing the valve tray assembly in place (dia-
11)Undo the quick drop out thermocouple nut on the valve with a 9mm (metric) wrench.
12)Remove the Piezo igniter wire and push button assembly.
13)Undo the "gas out" flare nut with a 13/16" wrench.
14)Undo the "gas out" flare fitting with an 11/ 16" wrench.
15)Remove the 4 Phillips head screws from the sides of the valve bracket and remove valve.
Hint: If you are using black pipe, ensure that there is a union by the valve, otherwise removal will be almost impossible.
Note: Failure to install a new gasket may severely affect the appliance performance.
9) Reinstall the 10 hold down screws. |
10) Hook up the 2 TP and 2 TH wires to the |
appropriate connections on the valve. |
11) Reinstall the front log stand. |
12) Install Burner/grate assembly. |
13) Hook up the gas line and check for gas |
leaks with a soap and water solution or a |
gas leak detector. (Do not use open flame |
for leak testing.) |
14) Fire up the unit temporarily. |
screws | Rear Log Stand |
15) Check the manifold pressure. |
16) Reinstall the logs and brick panels as |
needed. |
17) Close the door and replace the louvers. |
18) Fire up the unit again and check for proper |
flame appearance and glow on logs. |
screwsValve Tray Assembly Diagram 2: Rear Log Stand & Valve Tray Assembly
32 | Regency |