TABLE OF CONTENTS
SECTION 1: Heater Safety | 1 | SECTION 9: Gas Piping | 41 | ||
1.1 Manpower Requirements | 1 | SECTION 10: Wiring | 43 | ||
1.2 Safety Labels and Their Placement | 1 | 10.1 | Line Voltage Thermostat Wiring | 43 | |
1.3 California Proposition 65 | 1 | 10.2 | Low Voltage Thermostat Wiring | 44 | |
SECTION 2: Installer Responsibility | 4 | 10.3 | Internal Wiring | 45 | |
2.1 | Wall Tag | 4 | 10.4 | Ladder Diagram | 46 |
2.2 | Corrosive Chemicals | 4 | 10.5 | Electrical Connection to the Burner | 46 |
2.3 | National Standards and Applicable Codes | 4 | SECTION 11: Operation and Maintenance | 47 | |
SECTION 3: Clearances to Combustibles | 5 | 11.1 Sequence of Operation | 47 | ||
3.1 | Required Clearances to Combustibles | 5 | 11.2 To Shut Off Heater | 47 | |
SECTION 4: National Standards and Applicable Codes ... | 10 | 11.3 To Start Heater | 47 | ||
4.1 | Gas Codes | 10 | 11.4 | 47 | |
4.2 | Aircraft Hangars | 10 | 11.5 Maintenance Checklist | 48 | |
4.3 | Public Garages | 10 | SECTION 12: Troubleshooting | 50 | |
4.4 | Electrical | 10 | 12.1 | Troubleshooting Flow Chart | 51 |
4.5 | Venting | 10 | 12.2 | Manifold Gas Pressure Setting | 53 |
4.6 | High Altitude | 10 | SECTION 13: Replacement Parts | 54 | |
SECTION 5: Major Components | 11 | SECTION 14: General Specifications | 57 | ||
5.1 | Standard Parts List | 12 | 14.1 | Material Specifications | 57 |
SECTION 6: Heater Installation | 14 | 14.2 | Heater Specifications | 57 | |
6.1 | Burner Tube Installation | 18 | 14.3 | Suspension Specifications | 57 |
6.2 | Tube Clamp Package Installation | 19 | 14.4 | Controls Specifications | 57 |
6.3 | Coupling and Tube Assembly | 19 | SECTION 15: The ROBERTS GORDON® GORDONRAY® BH | ||
6.4 | Turbulator Installation | 21 |
| Warranty | 59 |
6.5 | Reflector Installation | 22 |
|
|
|
6.6 | Burner Installation | 24 |
|
|
|
SECTION 7: Optional Heater Accessories | 25 |
|
|
| |
7.1 | 25 |
|
|
| |
7.2 Elbow Package Configuration | 28 |
|
|
| |
7.3 Reflector Side Extension | 31 |
|
|
| |
7.4 Lower Clearance Shield Installation | 32 |
|
|
| |
7.5 | 32 |
|
|
| |
7.6 Protective Grille Installation | 34 |
|
|
| |
SECTION 8: Venting | 35 |
|
|
| |
8.1 | Venting | 35 |
|
|
|
8.2 | Unvented Operation | 36 |
|
|
|
8.3 | Horizontal Venting | 36 |
|
|
|
8.4 | Vertical Venting | 36 |
|
|
|
8.5 | Unvented Operation Tube Termination | 36 |
|
|
|
8.6 | Length Requirements | 36 |
|
|
|
8.7 | Horizontal Ventilation 4'' (10 cm) Pipe | 36 |
|
|
|
8.8 | Vertical Ventilation 4'' (10 cm) Pipe | 37 |
|
|
|
8.9 | Common Side Wall Venting | 37 |
|
|
|
8.10 Common Vertical Venting | 38 |
|
|
| |
8.11 Outside Combustion Air Supply | 39 |
|
|
|
© 2012 Roberts-Gordon LLC
All rights reserved. No part of this work covered by the copyrights herein may be reproduced or copied in any form or by any means - graphic, electronic, or mechanical, including photocopying, recording, taping or information storage and retrieval systems - without the written permission of
Printed in U.S.A.