Roberts Gorden BH-150, BH-60 U-TubeHeater Assembly Overview, 26 of, Tight U-bolt, Loose U-bolt

Models: BH-125 BH-80 BH-200 BH-140 BH-100 BH-115 BH-175 BH-150 BH-40 BH-60

1 70
Download 70 pages 6.75 Kb
Page 32
Image 32
FIGURE 18: U-Tube Heater Assembly Overview

BH-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

FIGURE 18: U-Tube Heater Assembly Overview

Burner

Vent Adapter

U-tube

Support Bracket

Reflector

Support

Turbulator

(With Select

Models)

Tight U-bolt Reflector

Tube Clamp

Package

U-tube, Standard

12

Burner Loose U-bolt Tube

Tube

Couplings

26 of 59U-clips Reflector

U-tube, 45°

1

2

1

Tight U-bolt

Loose U-bolt

4" (10 cm) u-bolt,

2 4" (10 cm) u-bolt,

secured to burner tube

secured to bracket with

 

with 1/4" (.6 cm)

1/4" (.6 cm) lockwashers

 

lockwashers and

and 1/4" (.6 cm)-20 hex

1/4"(.6 cm) -20 hex nuts. nuts on top and bottom to allow for tube expansion

and contraction.

End Caps

U-tube

18" (46 cm)

Center to Center

U-tube, Opposite 45°

12

Manual background U-bolt

Nut

Manual backgroundManual backgroundLock Washer

Manual backgroundManual backgroundManual backgroundManual backgroundManual background Lock Washer

Nut

26 of 59

Page 32
Image 32
Roberts Gorden BH-150, BH-60, BH-40, BH-175, BH-115, BH-100 U-TubeHeater Assembly Overview, 26 of, Tight U-bolt, Loose U-bolt