Samsung HT-H5500K/SQ manual Installing the Speakers on the Half Tallboy Stand, Stand Base Speaker

Models: HT-H5500K/SQ

1 101
Download 101 pages 9.35 Kb
Page 10
Image 10

Connections

Installing the Speakers on the Half Tallboy Stand

* HT-H5530HK only - Front Speakers

1.Turn the Stand Base upside-down and connect it to the Speaker.

2.Use the driver to combine the screws on the 3 marked holes. Installing a speaker is finished. Follow the same steps to install other speakers.

3.If you want to adjust the height of the speaker, loosen a screw on the rear of the speaker base first.

4.Pull up the speaker in the arrow direction. (Be careful as an excessive force may result in a physical damage.)

5.Fit the speaker in a height adjusting a hole, and then use a screw to fasten a speaker.

6.This is appearance of after the speaker is installed and height adjusted. To adjust height of other speakers, follow the step 3 ~ 5.

Installing the Speakers on the Tallboy Stand

1 Stand Base

2

Speaker

34

5

6

or

*HT-H5530K only - Front Speakers

*HT-H5550K/HT-H5550WK only - Front/Surround Speakers

1.Turn the Stand Base upside-down and connect it to the Stand.

2.Use the driver to combine the screws on the 3 marked holes.

3.Straighten a supplied speaker wire to the gravity direction and put in the hole on the centre of Stand Base.

4.Connect the upper Speaker to the assembled Stand.

5.Insert a screw clockwise into the hole on the rear of the speaker using a screwdriver.

And then connect a speaker cable.

6.This is the appearance after the speaker is installed. Follow this steps to install other speaker.

1 Stand Base

2

Stand

3 4

Speaker

Stand

56

10 - English

Page 10
Image 10
Samsung HT-H5500K/SQ manual Installing the Speakers on the Half Tallboy Stand, Installing the Speakers on the Tallboy Stand