installation

5.Press the PTZ mechanism's A, B handles and pull out for Main Cable connection.

7.Care must be taken dome cover is hung by internal safety cable properly. Plug fan/heater cables into the connectors in the housing.



A B

6.Wrap the pipe thread of the housing top by Water proof tape [1].

After hooking the safety cable on the hole of pipe [2], attach the upper housing to mount bracket by turning it at least seven turns [3]. To fi x the upper body orientation, turn the handle of double nuts to clockwise tightly [4].

2

1

4

3

8.Plug the connector of cable from network box into properly.

English – 13

Page 13
Image 13
Samsung SNC-C7478 user manual Installation