Installation

4.Plug the connector of cable from network box into properly.

5.After checking the orientation of one touch connector in the upper housing, press the PTZ mechanism into hook in the upper housing.

7.Close the dome cover. Care must be taken to locate dome cover by matching the “Arrow” mark.

ٻ

ٻ

ٻ

ٻ

ٻ

ٻ

8.Tighten four screws on the dome cover in sequence as shown in the picture bellow.

1

ٻ

ٻ

ٻ

ٻ

ٻ

ٻ

4

2

G

6.To lock the PTZ mechanism to the upper housing, press the two black handles till it sounds snap.

G

3

To maintain the best sealing, the torque of each screw must be in the range between 0.5 ~ 1.0 N·m (0.37 ~ 0.73 lbf·ft).

English – 13

Page 13
Image 13
Samsung SNC-C7478P manual Plug the connector of cable from network box into properly