8. Preparations Before Operation
Check the following items before starting operation:①Visually inspect the UPS to verify that there is no visible damage.②Check that the UPS is connected to a utility power source that meets the inputspecifications.③ Check that the input breaker MAIN MCCB is set to “OFF”.④Check that load devices are connected correctly.⑤ Check that none of the cable connections is loose.
④, ⑤Check load connections.
③Breaker is “OFF”.
②, ⑤Check input power source
※This figure shows E11A202U001. As for E11A202U001J, shape and the number of receptacles are different.