Scotsman Ice specifications CME1356R and CME1656R, Head Pressure Control Add-OnKit

Models: CME1656R CME1356R

1 47
Download 47 pages 16.42 Kb
Page 13
Image 13
Head Pressure Control Add-On Kit
RCKCME6GX
12. Finish the balance of the installation. Ice machine’s precharged line sets will now connect to the quick connect fittings on the metal box instead of the condenser’s.

CME1356R and CME1656R

Head Pressure Control Add-On Kit

Kit: RCKCME6GX

Required when a CME1656R or CME1356R is to be connected to a Remote Condenser that is not equipped with a Head Pressure Control Valve

Required Tools: Screwdriver; Drill; 5/32" drill bit; Two Adjustable Wrenches; POE Oil

1.Remove cover from metal box.

2.Locate correct position on condenser: The RCKCME6GX can fit either a Mac G series or a Mac X series condenser.

￿Use a back up wrench to be certain that the tubing is NOT ROTATING. Only the SWIVEL NUTS should be rotating!

￿Then use an adjustable wrench to tighten them until no threads are seen AND a very definite resistance is felt.

9.Mark the positions of the swivel nuts to the condenser panel.

10.Rotate the swivel nuts additional one-quarter turn.

3. Use metal box as a template, mark the positions 11. Place cover on metal box & secure with screws. of 4 holes to be drilled to mount the box to the

condenser.

4. Drill four .157" (#22 or 5/32" bit) dia. holes.

5. Remove plastic covers from the condenser’s quick connects and those to be used to connect to the condenser.

6.Thoroughly clean and lubricate the threads and diaphragms of both the condenser’s and the kit’s quick connects. Use Polyolester oil.

7.Mount the box to the condenser with the screws from the kit.

8.Start the swivel nuts by hand.

G series

Connections to

Central Condenser

Central

Pre-Charged

Lines from

Ice Machine

X Series

May 2001

Page 13

Page 13
Image 13
Scotsman Ice specifications CME1356R and CME1656R, Head Pressure Control Add-OnKit