CME1356R and CME1656R
Bin Control: Installation
The bin control is a thermostat. It must be field installed after the ice machine has been placed on the bin.
Before starting, remove the left front panel and any baffle in the bin.
1.Locate bin thermostat bulb.
2.Route bulb thru routing tube (located between the compressor and the reservoir).
3.Locate bin thermostat bracket.
4.Carefully position the thermostat bulb on the bracket (see the diagram on the next page).
5.Fasten the bracket to the bottom of the ice machine with the two
6.Pull back into the ice machine any excess capillary tubing.
7.Return the baffle to the bin and continue with the installation.
Note: If the machine is located at an altitude higher than 2,000 ft., adjust the thermostat by removing the plastic cover and rotating the adjustment screw per the table.
Thermostat Bulb Routing Tube
Bin Thermostat Altitude Correction Table
CW Turns of Range Screw (under plastic cover)
Feet | Turns | Feet | Turns |
|
|
|
|
2000 | 55o | 8000 | 340o |
4000 | 160o | 9000 | 385o |
6000 | 250o | 10000 | 405o |
Use This Table to Adjust Thermostat
Bin Thermostat Bulb
Bin
Thermostat
Body
Thermostat Bulb
Routing Tube
Route Bin Thermostat Bulb Into Bin
May 2001
Page 6