Industry Automation and Drive Technologies - SCE

1PREFACE

Regarding its content, Module E11 is part of the instruction unit 'IT Communication with SIMATIC

S7’.

Fundamentals of

STEP7 Programmig

2 to 3 days

Modules A

Programming

Languages

2 to 3 days Modules C

Additional Functions of STEP7 Programming

2 to 3 days Modules B

Industrial Fiedbus

Systems

2 to 3 days Modules D

System Simulation with SIMIT SCE

1 to 2 days Modules G

Process

Visualization

2 to 3 days Modules F

Frequency Converter at SIMATIC S7

2 to 3 days Modules H

IT Communication with SIMATIC S7

2 to3 days Module E

Objective

In Module E11, the reader will learn how networking and data exchange between PLCs and RFID components is set up.

As PLC, the CPU 315F-2 PN/DP and as Radio Frequency Identification (RFID), a SIMATIC RFID system is used. The RFID components consist of the interface module RF180C (ASM) with write/read device RF310R (Reader or SLG (write/read device)) and different mobile data systems such as RF340T, RF350T, RF360T or ISO Moby D MDS D124 (transponder or MDS). PROFINET is used for networking the PLC and the SIMATIC RF180C.

Module E11 shows in principle the procedure for the startup, based on a brief example.

Prerequisites

To successfully work through Module E11, the following knowledge is assumed:

How to handle Windows

Fundamentals of PLC programming with STEP7 (for example, Module A ‘Startup’ PLC Programming with STEP7).

Fundamentals of network engineering (for example, Appendix V – Basics of Network Engineering)

TIA Training Document

Page 5 of 65

Module E11

 

Status: 01/2010

Radio Frequency Identification (RFID) with SIMATIC S7-300F-2PN/DP and

RF180C

 

Page 5
Image 5
Siemens S7-300F-2 PN, DP manual S7’, Objective, Prerequisites