4.Turn the dryer operation switch to the desired position. If you have a seven day timer installed, set it to “On with timer” position, otherwise set it to “On without timer” position. The blower will start. An explanation is given in the following diagram.
On without timer
OFF
On with timer
5.Turn the hopper heater switch to position “I”
Position “O”
Position “I”