Diagrama de instalación
¡IMPORTANTE! Todas las dimensiones son nominales. La tolerancia de abertura entre los postes es de +1/8″ (3
En caso de instalar una puerta de ducha con esta bañera, consulte las instrucciones de instalación del fabricante de la puerta para cualquier consideración especial de la estructura de postes de madera.
Construct the Framing
NOTE: Refer to the
Framing Provisions
WARNING: Risk of product and property damage. The bath must be supported by the subfloor. The wall surrounds are not designed to hold the bath in place
and are not intended to be load bearing. The clips or roofing nails must be used to prevent the bath from lateral movement.
The bath with apron must be attached to the studs on three sides.
A subfloor must be installed. The bath must be positioned to allow clearance for drainage through the floor joists or slab and to allow convenient plumbing installation.
Studs must be positioned roughly as shown in the
For Bath Only without Wall Surrounds
Provide the necessary backing or support for shelving, grab bars, towel bars or other accessories. Refer to the accessory manufacturer’s instructions for proper installation.
For Bath with Wall Surrounds
NOTE: If the wall surrounds will be installed to a masonry wall, make provisions for plumbing connections. For the plumbing end wall, construct a separate frame wall a minimum of 6″ (15.2 cm) from the masonry wall. For the remaining walls, use 2x2 furring strips to provide stud locations.
Ensure that the outer stud is positioned with the vertical wall flanges 30″ (76.2 cm) from the back wall. The outer edge of the stud should align with the edge of the wall flange.
IMPORTANT! Accessories that require backing or support are not recommended for this installation. Installing these accessories could void the warranty.
Ensure fiber or other soft insulation does not drop down into the water channel. Cover or seal any loose material. Failure to do so may cause wicking of water from the water channel into the insulation which may induce mold, leakage, or mildew. Ensure the channels are free of debris after installation.
For Above-the-Floor Drain Baths
Ensure the drain piping can pass through the wall and that the load bearing requirements of the wall are satisfied. Modify the framing or raise the subfloor as required to obtain clearance.
For All Installations
Sterling | 9 |