Manuals
/
Subaru Robin Power Products
/
Lawn and Garden
/
Portable Generator
Subaru Robin Power Products
EY44-2, EY33-2
manual
Models:
EY44-2
EY33-2
1
42
43
43
Download
43 pages
43.18 Kb
36
37
38
39
40
41
42
43
Troubleshooting
Install
12CONNECTING ROD and Piston
Maintenance
Disassembly and Reassembly
Adjusting Tappet Clearance Fig
15AIRCLEANER
4MAGNETO Service Instructions
Features
Page 42
Image 42
Page 41
Page 43
Page 42
Image 42
Page 41
Page 43
Contents
Page
Diesel
FuelSystem
Troubleshooting
RUN-INOPERATION
SPEC1FICATIONS
Continuousratedoutput
Performance
1MAXIMUMOUTPUT
3MAXIMUMTORQUEANDFUEL Consumption RATIOATMAX.OUTPUT
Features
Performance Curve
Model EY44-2
Lighting Coil
FLYWHEELCOOLI~GFAN
SEl
Crankshaft
Crankcase
Mainbearing Cover
Camshaft
Cooling
15AIRCLEANER
10GOVERNOR
Lubrication
2VENTILATION
Installation
Mounting
Exhaust GAS Evacuation
Rope Startingengine
ENGINEwithSTARTINGMOTOR
1PREPARATIONS and Suggestions
Specialtools
4MUFFLER
2BLOWER Housing and Cylinderbaffle
3AIRCLEANER
5GOVERNORLEVER and Carburetor
Tappet Chamber with the Compressor
Valve and Valvestemholeclearance
0oss
Adjusting Tappet Clearance Fig
9CYLINDERBLOCK
12CONNECTING ROD and Piston
Camshaft and Tappet
Piston and Connecting ROD
Assembly of Connecting ROD
Piston Ring See Fig
13CRANKSHAFT -3-13
Magneto
4MAGNETO Service Instructions
See Fig
Checking Ignition Spark
Governor Adjustment
Carburetor
Operation and Construction see Figs -1-1and
Float System
Disassembly and Reassembly
Pilot System
4MAIN System
3ADJUSTMENT
3PILOT System
5FLOATSYSTEM
RUN-IN Operation of Engine after Reassembly
Startingdifficulties
11 1 1 Fuel System
Compression System
Engine Misses
Engine Stops
Engineoverheats
11-5ENGINE Knocks
11-6ENGINE Backfires Through Carburetor
Checks and Corrections
Orrection Table
Size
Io.1
+o.1
01500
250-300 18-2
Every 50 HOURS10DAY Checks and Maintenance
Daily Checks and Maintenance
EVERY20HOURS Checks and Maintenance
134EVERY 100 200 Hoursmonthly Checks and Maintenance
13-5EVERY 500 600 Hourssemianual Checks
Maintenance
13-6EVERY 1000 Hours Yearly Checks and Maintenance
13-7PREPARATION for Long Abeyance
Page
Page
Industrial Engines
Top
Page
Image
Contents