Sunlife Enterprises DM300 External Supply Connection, External Shut-Off, Bottom Supply Connection

Models: DM300 DM240 DM180

1 56
Download 56 pages 41.42 Kb
Page 15
Image 15
FIGURE 6 - EXTERNAL SUPPLY CONNECTION

356214-XIM-A-0108

Natural gas may contain some propane. Pro- pane, being an excellent solvent, will quickly dissolve white lead or most standard commer- cial compounds. Therefore, a special pipe compound must be applied when wrought iron or steel pipe is used. Shellac base compounds such as Gaskolac or Stalastic, and compounds such as Rectorseal #5, Clyde's or John Crane may be used.

4.All piping should be cleaned of dirt and scale by hammering on the outside of the pipe and blowing out the loose dirt and scale. Before initial start-up, be sure that all of the gas lines external to the unit have been purged of air.

5.The gas supply should be a separate line and installed in accordance with all safety codes as prescribed under "Limitations". After the gas con- nections have been completed, open the main shut-off valve admitting normal gas pressure to the mains. Check all joints for leaks with soap solution or other material suitable for the purpose. NEVER USE A FLAME.

FIRE OR EXPLOSION HAZARD

FAILURE TO FOLLOW THE SAFETY WARN- ING EXACTLY COULD RESULT IN SERIOUS INJURY, DEATH OR PROPERTY DAMAGE.

NEVER TEST FOR GAS LEAKS WITH AN OPEN FLAME. USE A COMMERICALLY AVAILABLE SOAP SOLUTION MADE SPE- CIFICALLY FOR THE DETECTION OF LEAKS TO CHECK ALL CONNECTIONS. A FIRE OR EXPLOSION MAY RESULT CAUS- ING PROPERTY DAMAGE, PERSONAL INJURY OR LOSS OF LIFE.

6.The furnace and its individual manual shut-off valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.48kPa).

The furnace must be isolated from the gas supply piping system by closing its individual manual shut- off valve during any pressure testing of the gas

supply piping system at test pressures equal to or less than 1/2 psig (3.48kPa).

7.A 1/8 inch NPT plugged tap, accessible for test gage connection, must be installed immediately upstream of the gas supply connection to the fur- nace.

FIGURE 6 - EXTERNAL SUPPLY CONNECTION

EXTERNAL SHUT-OFF

FIGURE 7 - BOTTOM SUPPLY CONNECTION

EXTERNAL SHUT-OFF

L.P. UNITS, TANKS AND PIPING

All gas heat units are shipped from the factory equipped for natural gas use only. The unit may be converted in the field for use with L.P./propane gas with accessory kit model number 1NP0418.

All L.P./propane gas equipment must conform to the safety standards of the National Fire Protection Associ- ation.