Chapter 5: Advanced Serverboard Setup

7.With the CPU in the socket, in- spect the four corners of the CPU to make sure that it is properly installed.

Gold dot Socket key

8.Use your thumb to gently push the load lever down until it snaps into the retention clasp.

9.If the CPU is properly installed into the socket, the PnP cap will be automatically released from the load plate when the lever locks. Remove the cap. Repeat steps to install a second CPU if desired.

Warning! Keep the plastic PnP cap. The serverboard must be shipped with the PnP cap properly installed to protect the CPU socket. Shipment without the PnP cap properly installed will void the warranty.

CPU key

Notched corner

CPU pin 1

Load lever

CPU installed in socket

PnP cap released

from load plate

5-7

Page 39
Image 39
SUPER MICRO Computer SERIES3800, S120T user manual Gold dot Socket key