The procedures within this Chapter contain relevant information to ensure your SV-2000- X2 Server maintains its maximum performance potential.

6.1Server Startup

1.Check to make sure that all the cables are seated and connected correctly to the back of the unit such as keyboard, mouse, monitor VGA cable and both power cables.

2.Then Press the power switch ON to start the computer (power switch is located in the front of the unit)

3.Once the unit starts, System will go thru Power On self Test (POST) (no action is required at this time)

4.At windows dialog box press Ctrl, Alt, Delete at once to login

5.Type in the correct user name and password and then press enter to login

6.Once the operator is logged on to the unit they could use the computer as they wish.

NOTE: Assuming the Server is not connected to any network.

6.2Server Shutdown

1.The operator needs save any data that is needed to be saved and then close application

2.Once all data is save and applications are closed, click on Start menu, select shutdown and then click OK to shutdown the computer.

6.3Identifying Server Components Using Device Manager

The Device Manager is one of Windows' most useful diagnostic tools. It lets you see all of the devices attached to your computer, and which resources they are each using. To access the Device Manager do the following:

SV-2000-X2 Server (CENTRIX / JHSV)

 

Part Number: 1008080

Page 30 of 82

Version 1.4. 01/12/2010

 

Page 30
Image 30