Telenetics 2185
INSTALLATION PROCEDURE
Equipment Assembly
The 2185 is shipped as a completely assembled unit with the printed cir- cuit board and power supply
Installation Tools Required
The only tool required is a small slot screwdriver to tighten the screws securing the interface cable connectors to the connectors on the unit's rear panel.
Mechanical Installation
The 2185 is a “tabletop” unit.No provisions are made for securing the unit to any surface.
Cabling
All external connections to the 2185 are made via EIA
In Figure
Port 0 | = Main Channel | Port 1 = Subchannel 1 |
Port 2 | = Subchannel 2 | Port 3 = Subchannel 3 |
Port 0 | = Subchannel 4 | Port 1 = Subchannel 5 |