Telenetics 2185 Installation Procedure, Equipment Assembly, Installation Tools Required, Cabling

Models: 2185

1 64
Download 64 pages 19.17 Kb
Page 19
Image 19

Telenetics 2185

INSTALLATION PROCEDURE

Equipment Assembly

The 2185 is shipped as a completely assembled unit with the printed cir- cuit board and power supply sub-assemblies already installed.No further assembly is required.

Installation Tools Required

The only tool required is a small slot screwdriver to tighten the screws securing the interface cable connectors to the connectors on the unit's rear panel.

Mechanical Installation

The 2185 is a “tabletop” unit.No provisions are made for securing the unit to any surface.

Cabling

All external connections to the 2185 are made via EIA 232-D, 25-pin, connectors located on the rear panel (see Figure 2-1) and their associ- ated straight-through cables.There are six connectors, one for the main channel, and one for each subchannel.

In Figure 2-1:

Port 0

= Main Channel

Port 1 = Subchannel 1

Port 2

= Subchannel 2

Port 3 = Subchannel 3

Port 0

= Subchannel 4

Port 1 = Subchannel 5

2-3

Page 19
Image 19
Telenetics 2185 Installation Procedure, Equipment Assembly, Installation Tools Required, Mechanical Installation, Cabling