Thermo Products CHX3-125N, CDX3-75N, CHX3-75N B. Initial Start Up, Operating Instructions

Models: CDX3-100N CHX3-100N CDX3-125N CHX3-125N CHX3-75N CDX3-75N

1 65
Download 65 pages 33.09 Kb
Page 44
Image 44
B. INITIAL START UP:

All installations and services must be performed by qualified service personnel.

B. INITIAL START UP:

This furnace does not have a pilot. It is equipped with a hot surface igniter, which automatically lights the burner. Do not attempt to light the burner by hand. Check the following items before the initial start-up.

1.Check all wiring for loose connections and proper hook up.

2.Leak test gas piping connections.

3.Check all tubing to the pressure switch and drains to make sure they are connected firmly at all their connection points.

4.Check flue pipe, combustion air inlet and all PVC connections for tightness and to make sure there is no blockage.

5.Make sure air filter is in place.

6.Make sure the outside vent and air intakes are installed according to instructions and that they are free from blockage.

7.Make sure that the drain trap is properly connected to the furnace and to the buildings drain system.

OPERATING INSTRUCTIONS:

OPERATING INSTRUCTIONS:Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background: Turn off power to furnace before it is placed into service. The gas piping system must have been leak tested by a qualified heating contractor. (See Section III, J, of these instructions on the installation of gas piping).

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background: It may be necessary to purge the air out of the gas line for initial start-up of the furnace after installation. This should be done by a qualified heating contractor. If excessive gas escapes when purging the gas supply at the union, allow the area to ventilate for at least 15 minutes before attempting to start the furnace. LP gas is especially dangerous because the specific gravity of LP gas allows it to accumulate at floor level at a dangerous concentration. For remainder of operating instructions, reference Users Information Manual.

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background: Heat exchanger oil will burn off on initial firing creating an unpleasant odor. To prevent this odor from occurring more than once, it is suggested that:

1.A window(s) be opened.

2.The thermostat be set at highest setting.

3.The furnace remain running at conditions 1&2 for 30 minutes or until odor has dissipated.

38

Page 44
Image 44
Thermo Products CHX3-125N, CDX3-75N, CHX3-75N, CDX3-125N, CHX3-100N, CDX3-100N B. Initial Start Up, Operating Instructions