Toshiba 4200FA CT/XT Start-up/Scheduled Maintenance/Part Replacement, Preventive Maintenance

Models: 4200FA CT/XT

1 68
Download 68 pages 57.67 Kb
Page 62
Image 62
8.0Start-up/Scheduled Maintenance/Part Replacement

TOSHIBA

 

Protection Item

 

 

Memory error (EERR)

 

Internal overheat

 

 

DC circuit

 

DC circuit overcurrent

 

 

 

 

(OH)

 

 

overvoltage (DCOV)

 

(DCOC)

 

 

 

 

 

 

 

 

 

 

LCD Message

 

MAIN EEPROM ERROR

OVERHEAT; INTERNAL

 

 

DC OVERVOLTAGE

 

DC OVERCURRENT

 

Cause

 

Control board chip error

Fan failure; high ambient

 

 

Chopper malfunction

 

Inverter / chopper fault

 

Operation Mode

 

Start is inhibited

Bypass operation; chopper and inverter are stopped

 

after Fault

 

 

 

 

 

 

 

 

 

 

 

 

Audible Alarm

 

 

 

Yes; continuous buzzer

 

 

 

Visible Alarm

 

 

 

RED fault lamp “ON”

 

 

 

Relay Contact

 

 

 

Fault relay closed; bypass relay closed

 

 

 

Alarm

 

 

 

 

 

 

 

 

 

 

NO

 

 

 

Auto-Retransfer

 

 

 

 

 

 

8.0Start-up/Scheduled Maintenance/Part Replacement

8.1Start-up

The startup of the UPS equipment is broken up in several steps. These steps are as follows:

1.Initial Condition: This is where the service technician checks the unit for physical damage and verifies the installation of the UPS (electrically).

2.Static Checks: This step verifies the proper settings within the UPS logic.

3.Wiring Check: The wiring to (power cables) and from (control wires) the battery cabinet.

4.Main Voltage Check: The input voltages are checked to verify they are within the range.

5.Energizing the UPS: This step begins the internal self-checks within the processor logic.

6.Output Voltage Check: The output voltages are checked to verify they are within range.

7.EPO (Emergency Power Off): The EPO is operated to verify its operation in case of an emergency.

8.Load Testing: Performed if load is available.

9.Generator Testing: Performed if Generator is available.

10.Internal/External Maintenance Bypass: This verifies the proper operation of the Maintenance Bypass.

8.2Preventive Maintenance

The TOSHIBA 4200FA Uninterruptible Power Systems have been designed to provide no years of trouble-free operation requiring a minimum of preventive maintenance.

The best preventive measure that the UPS user can take is to keep the area around the unit, particularly the air inlet vents, clean and free of moisture and dust accumulations. Schedule authorized TOSHIBA service centers to perform an internal parts inspection semi-annually.

8.1Start-upCAUTION

WARNING

Before performing any maintenance the technician should be familiar with and follow the important safety instructions within this manual.

Proper maintenance of the battery system of this unit by a qualified service technician is essential to the safety and reliability of your UPS system. Schedule authorized TOSHIBA service centers to perform internal parts

inspections semi-annually.