TS8G~16GCF600

600X CompactFlash Card

 

 

 

4)The parameter tLI shall be measured at the connector of the sender or recipient that is responding to an incoming transition from the recipient or sender respectively. Both the incoming signal and the outgoing response shall be measured at the same connector.

5)The parameter tAZ shall be measured at the connector of the sender or recipient that is driving the bus but must release the bus the allow for a bus turnaround.

Name

Comment

 

 

t2CYCTYP

Typical sustained average two cycle time

tCYC

Cycle time allowing for asymmetry and clock variations (from STROBE edge to STROBE edge)

 

 

t2CYC

Two cycle time allowing for clock variations (from rising edge to next rising edge or from falling edge to

next falling edge of STROBE)

 

tDS

Data setup time at recipient (from data valid until STROBE edge)

 

 

tDH

Data hold time at recipient (from STROBE edge until data may become invalid)

 

 

tDVS

Data valid setup time at sender (from data valid until STROBE edge)

tDVH

Data valid hold time at sender (from STROBE edge until data may become invalid)

 

 

tCS

CRC word setup time at device

 

 

tCH

CRC word hold time device

tCVS

CRC word valid setup time at host (from CRC valid until -DMACK negation)

tCVH

CRC word valid hold time at sender (from -DMACK negation until CRC may become invalid)

tZFS

Time from STROBE output released-to-driving until the first transition of critical timing.

tDZFS

Time from data output released-to-driving until the first transition of critical timing.

 

 

tFS

First STROBE time (for device to first negate DSTROBE from STOP during a data in burst)

 

 

tLI

Limited interlock time

tMLI

Interlock time with minimum

tUI

Unlimited interlock time

tAZ

Maximum time allowed for output drivers to release (from asserted or negated)

tZAH

Minimum delay time required for output

 

 

tZAD

drivers to assert or negate (from released)

 

 

tENV

Envelope time (from -DMACK to STOP and -HDMARDY during data in burst initiation and from

DMACK to STOP during data out burst initiation)

 

tRFS

Ready-to-final-STROBE time (no STROBE edges shall be sent this long after negation of -DMARDY)

 

 

tRP

Ready-to-pause time (that recipient shall wait to pause after negating -DMARDY)

tIORDYZ

Maximum time before releasing IORDY

 

 

tZIORDY

Minimum time before driving IORDY

tACK

Setup and hold times for -DMACK (before assertion or negation)

tSS

Time from STROBE edge to negation of DMARQ or assertion of STOP (when sender terminates a

burst)

 

 

 

Notes

2, 5 2, 5 3 3 2 2 3 3

1

1

1

6 4, 6

Transcend Information Inc.

34

V1.0

Page 34
Image 34
Transcend Information TS8GCF600, TS16GCF600 dimensions Name Comment