TRENDnet 18-1106-33 user manual Mains connection

Models: 18-1106-33

1 27
Download 27 pages 29.55 Kb
Page 10
Image 10
3.5Mains connection

3. Installation

3.5Mains connection

liquid pour into a large vessel using hydrostatic pressure. The bath contains 3 litres of liquid, plus the volume in tubing and connected equipment. The last millilitres can be removed by opening the screw on the front of the unit, (see Fig. 1).

Warning! Do not drain hot water. Use protective gloves and clothing when draining the bath liquid.

Compare the local mains voltage and frequency with the spe- cifications written on the label on the rear of the unit before connecting the unit to a grounded mains socket. Deviations of voltage and frequency must not be more than those speci- fied in this manual (95 to 132 V/60 Hz, 95 to 125 V/ 50 Hz, 198 to 253 V/50 Hz). Connect the unit to a grounded mains socket only. The socket must be rated as suitable for the total power consumption of the unit (1,200 W).

8

Page 10
Image 10
TRENDnet 18-1106-33 user manual Mains connection