13.The entire assembly may now be positioned on the four threaded stud bolts protruding from the cavity wall. Fasten the assembly with the 1/4-20 Keps nuts using a socket wrench. Make sure that the green ground strap is fastened by one of the Keps nuts securing the motor.

10.19Motor Starting Capacitor P/N 096813

1.Turn off electrical power to the steamer.

2.Loosen and remove the screw holding the capacitor.

3.Unplug the two terminal wires from the capacitor. Remove the capacitor.

To Install New Capacitor:

NOTICE: Make sure that the correct capacitor is used, which is 3 mfd at 330 volt. This capacitor is different from that used on Model HY-6G.

4.Make sure the capacitor is seated properly, then tighten the screw securing the capacitor to the mounting plate.

5.Plug terminal wires to the capacitor.

10.20Steam Generator Ready Thermostat P/N 088865

This thermostat is attached to the cavity steam port by two 6-32 screws.

1.Turn off power to the steamer.

2.Unplug the two wires from the thermostat from the wiring harness.

3.Using a flat blade screwdriver, remove the two screws holding the thermostat to the steam port.

4.To install a new thermostat, use a small amount of heat sink compound (1 drop), applied to bottom of thermostat. Seat the thermostat on the steam port and fasten with the two screws (as above).

5.Plug the thermostat into the wiring harness.

10.21 Steam Port

Gasket

P/N 096736

P/N 099250

1.Shut off power to the steamer.

2.Remove the 1-1/8 inch steam hose by loosening the clamp around the hose and sliding it away from the

steam port. Loosen hose and remove from steam port.

3.With a flat blade screwdriver, remove the two 6-32 screws holding the thermostat to the steam port.

4.With a sharp knife or small scissor, cut the aluminum foil insulation blanket as shown at left.

5.Fold up aluminum foil insulation blanket to expose the two 1/4-20 Keps nuts which hold the steam port to the cavity wall threaded studs.

6.With a socket wrench, remove the two Keps nuts.

7.Remove the steam port from the threaded studs.

To Install:

8.Put a small bead of silicone sealant in and around the groove in the steam port to seal any possible leaks, or use gasket P/N 099250.

9.Install steam port on threaded studs. Secure with two Keps nuts.

10.Fold down aluminum foil insulation blanket to original blanket position and repair cuts with aluminum foil duct tape.

11.Reinstall thermostat as described in 10.20 above.

12.Reinstall steam hose to steam port and install the clamp.

10.22Cavity Steam Hose Assemblies P/N 099952 (Top)

P/N 099951 (Bottom)

There are two hoses which connect the steam generators with their respective cavities. One for the top cavity and one for the bottom cavity. If both hoses are to be replaced, replace them one at a time.

1.Shut off power to the steamer.

2.Remove cavity side and lower side panels of table.

3.In the upper portion of the steamer, remove hose. Turn and pull the hose to remove it from the hose nipple.

4.In the lower section of the steamer, remove the hose clamp from where the hose is connected to the steam generator. Turn and pull the hose to remove it from the hose nipple.