Vanguard Heating VS18PR, VS24PR, VS30PR installation manual Installing Installing Logs, Continued

Models: VS18PR VS30PR VS24PR

1 32
Download 32 pages 41.47 Kb
Page 17
Image 17
INSTALLING INSTALLING LOGS

INSTALLING INSTALLING LOGS

 

Continued

WARNING

 

Failure to position the parts in accordance with these diagrams or failure to use only parts specifically approved with this heater may result in property damage or personal injury.

Each log is marked with a number. These numbers will help you identify the log when installing. It is very important to install these logs exactly as instructed. Do not modify logs. Only use logs supplied with heater.

1.Place front logs (#1L and #1R) on top of the grate. Make sure the notches in the bottom of the logs fit over the grate prongs (see Figure 16). Push back of logs flush with metal grate bar. Note: 18" model has only one front log.

2.Rest bottom middle log (#2) behind metal posts on front burner. Make sure the grooves in the bottom of the log fit over the grate. Bring the log forward next to the metal posts. The pegs on the log must be on top (see Figure 17).

3.Slide the grooves in the back of the rear log (#3) against the rear grate prongs. Make sure the peg on the log is on top (see Figure 18).

4.Place the top middle log (#4) on the bottom middle log (#2). Make sure the pegs of the bottom middle log fit securely in the holes of the top middle log (see Figure 19).

 

Front Log (#1L)

Peg

Bottom Middle Log (#2)

 

 

Notch

Front Log (#1R)

Groove

Peg

 

 

 

 

Metal Post

 

Grate

 

Prongs

Groove

 

Metal Grate Bar

 

Metal Post

Grate

 

 

 

 

 

Figure 16 - Installing Front Logs

 

Figure 17 - Installing Bottom

 

 

(#1L and #1R)

 

 

Middle Log (#2)

 

Groo ve

Peg

 

 

 

 

in Back

 

 

Top Middle Log (#4)

 

of Log

Rear Log (#3)

 

 

 

 

 

Grate

 

 

 

 

 

Prong

 

Hole

 

 

 

Rear

 

 

Peg

 

 

Burner

 

 

Hole

 

Groove

 

 

 

 

 

 

 

 

 

 

 

in Back

 

 

 

 

 

of Log

 

 

 

 

 

Grate

 

 

 

 

 

Prong

 

 

 

 

 

Bottom

 

 

 

 

Middle Log

Peg

 

 

 

 

 

 

 

 

 

 

Continued

Figure 18 - Installing Rear Log (#3)

 

Figure 19 - Installing Top Log (#4)

17

103448

Page 17
Image 17
Vanguard Heating VS18PR, VS24PR, VS30PR installation manual Installing Installing Logs, Continued