Installing The Vanguard 3400 Series

Installation

How to Choose a Site

Before you install the Vanguard 3400 Series, select a site for the device.

Choose a site that is within an appropriate distance of a power source. Depending on your application, and the country in which the Vanguard 3400 Series is to operate, the power source must be a grounded 110 to 220 Vac outlet.

Leave at least 2 inches (5 cm) of clearance in front of the front panel, to allow you to see the front panel LEDs, and 6-inches behind the unit for cable clearances (see Figure 3-2). For proper ventilation, leave 2 inches (5 cm) of clearance on the sides.

The site should be free of accumulated dust and environmental extremes. Refer to Appendix A, Specifications for details.

Minimum 2-inches (5 cm) Front

and 6-inches (15 cm) Rear

Note: Do not remove the rubber feet from the bottom of the unit. They allow for proper air flow.

Minimum 2-inches (5 cm) on either side for ventilation.

Figure 3-2. Proper Cable and Air Clearance

Caution

Vanguard 3400 Series devices should be used in environments designed for computers and electronic equipment. In areas susceptible to lightning, take precautions to prevent damage to electronic equipment. Contact your telephone company or an electronic accessories vendor for information on lightning protection equipment. Customers experiencing problems caused by surges from lightning have eliminated such problems by installing appropriate surge suppressors on power and data lines.

3-4

Installation and Replacement

Page 40
Image 40
Vanguard Managed Solutions 3400 Series manual How to Choose a Site, Proper Cable and Air Clearance