Manuals
/
Vanguard Managed Solutions
/
Computer Equipment
/
Network Card
Vanguard Managed Solutions
650 installation manual Vanguard Managed Solutions, 651/652 Models
Models:
650
1
1
82
82
Download
82 pages
61.12 Kb
1
2
3
4
5
6
7
8
<
>
Specs
Install
Error messages
Configurations
Connecting Ports
See This Procedure
Loader Error
Interface Signal Name
652/654 POTS With/Without Battery Backup
Battery Pack
Page 1
Image 1
Vanguard Managed Solutions
651/652 Models
STATUS
ISDN-D
TEST POTS1
PWR POTS2
650
650 Series Installation Manual
Page 2
Page 1
Image 1
Page 2
Contents
650 Series Installation Manual
Vanguard Managed Solutions
651/652 Models
STATUS ISDN-D
Proprietary Material
Safety Warnings
Product Declarations and Regulatory Information
Internet Information
Hazardous Voltage
Power Supply
POTS Connection
Socket Outlet Installation
Connecting Ports
PSTN Direct Connection
Chapter 2. Installing 650 Series Hardware
Contents
Chapter 3. Installing and Coldloading 650 Series Software
About This Manual Customer Information Customer Response Card
Appendix A. Specifications
Contents continued
Return Procedures Index
Appendix B. Software License and Regulatory Information
Overview
About This Manual
Introduction
Audience
Mise en Garde
About This Manual continued
Vorsicht
Avertissement
Vanguide ONS
About This Manual continued Related Documentation
CD-ROM
Other
Page
Customer
Customer Information
Questions
Comments About
Page
Document Title 650 Series Installation Manual
Customer Response Card
Page
Getting Started
Chapter
In This Chapter
Topic
What Is the 650?
Configurations
Supported
Protocols
Standard Features
Vanguard 650 Series Features
ISDN Service
Multiprotocol
Figure 1-2. Sample 650 Network Topology
Sample Network Topology
Introduction
651/653 - Data Only
Connector Type
External Designation
Internal CTP
Connector Type
652/654 POTS With/Without Battery Backup
Introduction
External Designation
Types of Equipment Supported POTS Support Guidelines
652/654 With POTS Support
Introduction
Battery Pack
652/654 With POTs and Battery Backup
Battery Backup
Rechargeable
Backup
With Battery
Storing the
Introduction 651/653 Hardware Components
Hardware
652/654 Hardware Components
Front Panel
Detailed 650 Series Front Panel
Figure 1-3. 650 Front Panel LED’s
Introduction
Panel DIP Switches
Figure 1-4. 650 Front Panel Switches
Switch
Switch Name
Detailed 650 Series Rear Panel
Figure 1-5. 650 Series Rear Panel Connectors
Power Supply
Power
Introduction
Software
Step
Figure 1-7. Software Option Statistics - Screen 2 of
Figure 1-6. Software Option Statistics - Screen 1 of
Software
Getting Started
Page
See This Procedure
Installing 650 Series Hardware Overview
Chapter
Follow These Steps
Figure 2-1. Vanguard 650 Series Shipment Contents
Checking Your Shipment Contents
Introduction
Choosing a Site
Introduction How to Choose a Site for the Vanguard
Figure 2-2. Proper Cable and Air Clearance
Figure 2-3. 650 Series Back Panel
Cabling the 650 Series
Introduction
Air Circulation
Cable Clearance
ISDN Cable
Data 1 and Data
Changing the
Figure 2-4. 4-Wire and 2-Wire Modem Strapping Positions
Modem Strapping
Powering Up
Powering Up the Vanguard 650 Series
Diagnosing Start
up Failures
Panel Removal
Removing the Top Cover and Front Panel
Figure 2-5. Opening the 650 Series
Introduction
Installing and Coldloading 650 Series Software
See Page
See This Procedure
Boot PROM
Boot PROM
650 Operating Software and Option Images
Image
Where to Get
Where to Get Operating Software
Operating Software
File Formats
Software
Description continued
Filename
Option Image Name 21 Reno
How To
Installing Software
Vanguide
Application Set
Coldloading
Coldloading 650 Series Operating Software
Software
Response
Action
Response continued
Step
Before You Begin
Loading Software via TFTP Download
Introduction
Step
DISABLED
DISABLED. The node is ready for
A node boot is required
Disable and Boot? y/n
Application
Downloading Software Using the Software Loader
Manager
Figure 3-1. Vanguide Application Manager Window
Figure 3-2. Software Loader Window
Loader
Step
Action
Figure 3-3. Software Loader Verification Dialog Box
Action continued
Figure 3-4. Software Loader Status Box
Or Click No to cancel the download operation
Figure 3-5. Vanguard Software Loader Error Message Box
Vanguard Configuration Loader Vanguard Configuration Loader
Downloading Configuration Memory CMEM
Figure 3-6. Configuration Loader Window
Step
Configuration
Figure 3-7. Configuration Loader Verification Dialog Box
Loader Error
Figure 3-8. Vanguard Configuration Loader Error Dialog Box
Vanguide Terminal
How To Use
Overview
Vanguide Terminal
Figure 3-10. Control Port Main Menu
Main Menu
Step
Action
Introduction
Linking Software Images Using Software Builder
Saving and
Selecting a Predesigned Configuration
Restoring CMEMs
To Use
When to Save Restore Initiating Save Restore Operations Using the CTP
Selecting a Predesigned Configurations Using the CTP
Figure 3-11. Configuration Save/Restore Menu
Restoring
Using Kermit
Saving and Restoring Configurations Using Kermit
Saving
Result
Step
Restoring Configurations Using Kermit
Action
Result
Using TFTP
Saving and Restoring Configurations Using TFTP
Configurations
Introduction
Using TFTP
Configurations
Restoring
Appendix A
Specifications Overview
In This Appendix
Specifications
Power Requirements Power Supply Description Safety Physical
Product Specifications
Hardware Environmental Electromagnetic Compatibility
Connector Pinouts
Figure A-1. RJ11/RJ45 Connector Pin Numbering
ISDN Cable Description
Introduction
Data 1 and Data 2 Cable Descriptions
Interface Signal Name
Cable Pinout
Pinout
4-Wire
Modem Signal
2-Wire
RJ45 to DB25
Interface Signal Name
DB25 Pin #
Interface Signal Name
Modem Signal
Interface Signal Name
Data 2 DB25
Pinout
Pin #
Page
Software License and Regulatory Information In This Appendix
Appendix B
Vanguard
Series
RESTRICTED RIGHTS LEGEND
If the Software is procured for use by any U.S. Government entity other than the Department of Defense, the following notice applies
Introduction Product Declarations and Regulatory Information
Product Declarations and Regulatory Information
CE Marking
D130 978J
Approval
French DRG
Netherlands
Radio Frequency
Requirements Canadian Department of Communications
Avertissement
Safety Warnings
Warnung
Page
For Locations
Return Procedures Introduction
Contact
Packaging
Factory Repair
Guidelines for
Equipment Return
Index