Vanguard Managed Solutions Installing 650 Series Hardware Overview, In This Chapter, Topic

Models: 650

1 82
Download 82 pages 61.12 Kb
Page 31
Image 31
Chapter 2

Chapter 2

Installing 650 Series Hardware

Overview

This chapter covers the installation of Vanguard 650 Series hardware and cables, and describes serial port characteristics and associated features.

In This Chapter

Topic

See Page

 

 

 

 

Checking Your Shipment Contents

2-2

 

Choosing a Site

2-3

 

Cabling the 650 Series

2-4

 

Powering Up the Vanguard 650 Series

2-7

 

Removing the Top Cover and Front Panel

2-8

Follow These Steps

 

This table lists the steps you need to perform and shows you where to look for

 

information on installing the Vanguard 650 Series:

 

Step

To Perform This Action
See This Procedure

1Check the contents of the ship- “Checking Your Shipment Contents”

 

ping package to make sure

section on page 2-2

 

everything is included.

 

 

 

 

2

Choose a site for the 650 Series.

“Choosing a Site” section on page 2-3.

 

 

 

3

Connect cables for the 650

“Cabling the 650 Series” section on

 

Series.

page 2-4.

 

 

 

4

Power up the 650 Series

“Powering Up the Vanguard 650 Series”

 

 

section on page 2-7.

 

 

 

Installing 650 Series Hardware

2-1

Page 31
Image 31
Vanguard Managed Solutions Chapter, Installing 650 Series Hardware Overview, Follow These Steps, To Perform This Action