Vermont Casting 820, 2828, 2823 Vertical Through the Roof Vent Assembly, Cut the opening, 20002191

Models: 2823 2825 820 2827 2828 2822

1 36
Download 36 pages 18.46 Kb
Page 18
Image 18
Vertical (Through the Roof)

Vermont Castings Jefferson Direct Vent/Natural Vent Gas Heater

 

Wall Screws

 

 

and Anchors

Waterproof Seal

Snorkel

Around Pipe

Termination

Firestop

Cap

 

 

4Ó Clearance

 

 

Gravel

 

 

Drain

 

 

Window Well

 

 

 

ST218

Fig. 28

Snorkel kit installation.

 

Recessed Wall

 

 

 

 

Firestop

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sheet Metal

 

 

 

 

 

 

 

 

 

 

Finishing

 

 

 

 

 

 

 

 

 

 

Screws and

 

 

 

 

 

 

 

 

 

Collar

Bracket

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wall Screws

and Anchors

Waterproof Seal

Around Pipe

7Ó Pipe

Wall Plate

ST219

Fig. 29 Use extension brackets to mount snorkel against recessed wall.

Vertical (Through the Roof)

Vent Assembly

Note that all vertically terminated installations must include the restrictor plate included with the stove. Refer to Figure 8, Page 8.

Make certain the vent system conforms to all other requirements for vertical termination as specified on Page 8.

This installation will require you to first determine the roof pitch and use the appropriate vent components. Refer to Figures 8 and 9 on pages 8 and 9.

1.Locate the final position of the stove, observing all clearances for both the vent and the stove.

2.Plumb to the center of the inner (4Ó) flue collar from the ceiling above, and mark that location.

3.Cut the opening:

CFM System: 9³⁄₈” x 9³⁄₈” (240mm x 240mm)

DuraVent System: 10” x 10” (254mm x 254mm)

4.Plumb any additional opening through the roof or other construction that may be needed. In all cases, the opening must provide a minimum of 1Ó (25mm) clearance to the vent pipe.

5.Place the stove in its final position.

6.Install firestop(s) #7DVFS and Attic Insulation Shield #7DVAIS as needed. (Fig. 30) If there is a room above ceiling level, a firestop must be installed on both the bottom and top sides of the ceiling joists. If an attic is above ceiling level, an attic insulation shield must be installed.

#7DVAIS

Attic Insulation

Shield

Use Four

#7DVFS

8d Nails

Firestop in

 

Upper Floor

 

#7DVFS

 

Firestop in

ST222

Ceiling

 

Fig. 30 Install firestops and attic insulation shield.

7.Install the appropriate roof support and flashing, making certain that the upper flange of the flashing base is below the shingles. (Fig. 31)

8.Install appropriate pipe sections until the vent run reaches above the flashing. The enlarged ends of the vent sections always face downward.

18