Vermont Casting 2822, 820 Injector Orifice Size Matrix, Conversion to Natural Gas, Input BTU/h

Models: 2823 2825 820 2827 2828 2822

1 36
Download 36 pages 18.46 Kb
Page 29
Image 29
Table 2. Injector Orifice Size Matrix

Vermont Castings Jefferson Direct Vent/Natural Vent Gas Heater

Pilot Hood

Pilot

Bracket

CO105a

Fig. 54 Remove pilot hood.

Index Tab

Allen Wrench

 

Snap Ring

 

CO106a

 

Fig. 55 Remove pilot orifice.

 

Pilot Hood

Index

Marks

Pilot Bracket

CO105

Fig. 56 Remove pilot hood.

Remove pilot orifice with needlenose pliers. (Fig. 57) NOTE: Use a wrench to hold pilot tube in place while removing the orifice.

Install the conversion orifice.

Reinstall pilot hood and tighten until mark on pilot hood aligns with mark on pilot bracket.

14.Remove injector orifices from left burner leg using 1/ 2Ó wrench. (Fig. 58)

15.Install conversion orifices. (Refer to Table 2) NOTE: Be sure burner leg remains at a 90° angle to

firebox base after conversion.

 

Pilot

 

Orifice

 

CO106b

Fig. 57

Remove pilot orifice.

16.Replace burner. Slide the burner in at an angle with left side lower than the right side. Slide the left side onto the injectors, making sure the burner leg remains at a 90° angle to the base. Lower the right hand side down in to place. Make sure the burner is as far left as possible and the injector shoulders are inside the burner.

NOTE: It is very critical to keep the left burner leg, which holds the injectors, at a 90° angle to the base. (Fig.

58)This keeps the orifices aligned with the tubes inside burner. Failure to do so could affect the flame appearance and performance of the unit.

19.Place conversion label on valve.

20.Reinstall the right and left log bracket assembly. 21.Reinstall the rear log bracket.

22.Replace logs.

23.Replace glass and stove front. Conversion is complete.

Left Burner Leg

Injector Orifices

90°

ST353a

Fig. 58 Remove and replace injector orifices.

Table 2. Injector Orifice Size Matrix

 

Conversion to Natural Gas

Input (BTU/h)

Kit #

Front

Part #

Rear

 

Part #

Minimum

Maxi,mum

000-5021

#54 / .055Ó

20000130

 

#44 / .086Ó

30000334

19,000

28,000

 

 

Conversion to LP

 

 

Input (BTU/h)

Kit #

Front

Part #

 

Rear

 

Part #

Minimum

Maximum

000-5022

#69 / .029Ó

30000513

 

#54 / .055Ó

 

20000130

20,000

28,000

20002191

29

Page 29
Image 29
Vermont Casting 2822, 820 Injector Orifice Size Matrix, Conversion to Natural Gas, Input BTU/h, Conversion to LP, 20002191