Vermont Casting DV580, DV360 EB-1 Electrical Box, Electronic Gas Control Valve, module, 20010667

Models: DV580, DV360 DV360

1 56
Download 56 pages 36.98 Kb
Page 9
Image 9
EB-1 Electrical Box

DV360/580 Series Direct Vent Gas Fireplace

EB-1 Electrical Box

INSIDE

Electrical Box

The fireplace, when installed, must be electrically connected and grounded in accordance with local codes or, in the ab- sence of local codes, with the current CSA C22.1 Canadian Electrical Code.

It is strongly suggested that the wiring ofEnsure that the power to the supply lineFRONT OF UNIT

OUTSIDE

For USA installations, follow the local codes and the national Electrical Code ANSI/NFPA No. 70.

It is strongly suggested that the wiring of

the EB-1 Electrical Junction Box be carried Fig. 9 EB-1 receptacle. out by a licensed electrician.

OF

UNIT

 

FRONT

FP580

Ensure that the power to the supply line

 

 

 

 

 

 

 

 

 

 

Electronic Gas Control Valve

has been disconnected before commenc-

This appliance may be fitted with a Synetek ignition

ing this procedure.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

module.

 

 

 

 

 

 

 

 

 

The EB-1 electrical junction box has been

 

 

 

 

 

 

 

 

 

Installation of the remote on/off starter switch or

supplied standard on the DV360/580 models to allow

wall thermostat on electronic ignition units.

for the easy installation of an optional fan kit.

1. Thread the wiring through the holes on the side

To connect the EB-1 box to the house electrical supply,

follow the steps below.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

panels of the appliance. Take care not to cut the wire

1. Unscrew the retaining screw from the EB-1 base

 

or insulation on metal edges. Route the wire to a

 

conveniently located receptacle box.

plate (Fig. 9) and remove the EB-1 assembly from

 

2. Attach the wire to the ON/OFF switch and install the

the fireplace.

 

 

 

 

 

 

 

 

 

 

 

 

 

2. Remove the front cover of the EB-1 box.

 

switch into the receptacle box.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3. Remove the plug socket

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

assembly from the EB-1

 

 

 

 

 

 

 

 

 

 

 

BLACK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L1

 

 

 

 

 

 

 

 

 

box.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WHITE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L2

 

 

 

 

 

 

 

 

 

4. Feed the supply line in

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POWER CORD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GREEN

 

 

from the outside through

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the cable clamp. (Fig. 9)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PURPLE

 

 

 

 

 

 

 

 

 

5. Connect black wire of

 

 

 

 

 

 

 

 

 

 

 

 

PILOT SENSING

the power supply line to

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PILOT IGNITER

the brass screw (polar-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ized) of the socket as-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

YELLOW

sembly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6. Connect the white wire

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M

 

 

P

 

 

 

 

 

 

of the power line to the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

chrome screw of the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

O

 

 

O

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

socket assembly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7. Connect the ground

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

wire of the supply line to

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VALVE

the green screw of the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CIRCUIT BOARD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

socket assembly.

 

 

 

 

 

 

 

 

 

 

 

 

 

BLUE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8. Refit the socket assem-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ORANGE

bly back into the electri-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RED

 

 

 

 

 

 

 

 

 

cal box and replace the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ON/OFF SWITCH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

cover plate. Secure the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WHITE

 

 

OR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WALL THERMOSTAT

cable with the clamp on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FP1571

the outside of the unit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

to prevent strain on the Fig. 10

 

SIT822 Valve with Synetek electronic control wiring diagram.

connections.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9.The EB-1 electrical junction box is now ready to sup- ply power to the FK12 or FK24 fan kits if fitted.

20010667

9

Page 9
Image 9
Vermont Casting DV580, DV360 EB-1 Electrical Box, Electronic Gas Control Valve, DV360/580 Series Direct Vent Gas Fireplace