Radiance Direct Vent Gas Heater |
| |
| Table of Contents |
|
PLEASE READ THE INSTALLATION & OPERATING INSTRUCTIONS BEFORE USING APPLIANCE. | ||
Thank you and congratulations on your purchase of a Vermont Castings stove. |
| |
IMPORTANT: Read all instructions and warnings carefully before starting installation. Failure to follow these instructions | ||
may result in a possible fire hazard and will void the warranty. |
| |
Installation & | General Information | 3 |
Operating Instructions | Stove Dimensions | 4 |
| Installation Requirements | 5 |
| Locating the Stove | 5 |
| Clearance Requirements | 5 |
| Parallel Installation | 6 |
| Corner Installation | 6 |
| Wall and Ceiling Clearances | 6 |
| Hearth Requirements | 6 |
| Gas Specifications | 7 |
| Gas Inlet and Manifold Pressures | 7 |
| High Elevations | 7 |
| Horizontal Termination | 7 |
| Vertical Termination | 8 |
| Restrictor Plate Adjustment for Extended Pipe Runs | 8 |
| Vent Termination Clearances | 9 |
| General Venting Information - Termination Location | 10 |
| Termination Clearances | 11 |
| Venting Requirements and Options | 12 |
Assembly Procedures | Tools Required | 14 |
| Parts Bag Contents | 14 |
| Unpack and Assemble Legs | 14 |
| Install Optional Fan | 15 |
| Venting System Assembly - Direct Vent | 16 |
| Install Vent Adapter Pipe (CFM Corporation Components) | 16 |
| Install Vent Adapter Pipe (Simpson | 16 |
| Install Vent Adapter Pipe (Selkirk Corporation Components) | 17 |
| Side Wall Termination Assembly | 17 |
| Vent Termination Below Grade | 19 |
| Vertical (Through the Roof) Vent Assembly | 19 |
| Selkirk | 20 |
| Install Log Set | 25 |
| Connect Gas Supply Line | 27 |
| Burner Information | 27 |
| Install ON/OFF Switch | 28 |
| Thermostat Connection (Optional) | 28 |
| Install the Mesh and Grille | 28 |
Operation | Your First Fire | 28 |
| Pilot and Burner Inspection | 28 |
| Flame & Temperature Adjustment | 29 |
| Flame Characteristics | 29 |
| Lighting and Operating Instructions | 30 |
| Troubleshooting - SIT NOVA 820 (RADVT Series) | 31 |
| Instructions for RF Comfort Control Valve | 32 |
| Fuel Conversion Instructions | 36 |
Maintenance | Annual System Inspection | 40 |
| Logset and Burner/Cleaning and Inspection | 40 |
| Care of Cast Iron | 40 |
| Cleaning the Glass | 40 |
| Glass Replacement | 40 |
| Gasket Replacement | 41 |
| Inspect the Vent System Annually | 41 |
| Check the Gas Flame Regularly | 41 |
| Wiring Diagrams | 42 |
Replacement Parts | ................................................................................................................................... | 43 |
Optional Accessories | ................................................................................................................................... | 47 |
Warranty | ................................................................................................................................... | 51 |
22 | 20012697 |