Radiance Direct Vent Gas Heater

Parallel Installation:

Minimum Clearance and Flue Centerline

42" (1070mm)

Min. Alcove Width

4" (102mm)

48"

(1220mm) Max. Alcove Depth

 

 

 

6"

 

 

 

6"

 

 

 

 

 

 

 

ST130

 

(150mm)

 

 

 

(150mm)

 

 

 

 

 

 

 

 

 

Fig. 3 Parallel installation, minimum back and side clear- ances, and flue centerlines.

Corner Installation:

Minimum Clearance and Flue Centerline

18"

(457mm)

6"

(150mm)

18"

(457mm)

6"

(150mm)

ST129

Fig. 4 Corner installation, minimum corner clearances and flue centerline.

Wall Centerline from Floor

Direct Vent Only

A

ST131b

A

Effective Minimum

Centerline 57” (1448 mm) (CFM Corporation Pipe) 55” (1399 mm) (Simpson DuraVent Pipe)

Fig. 5 Minimum wall centerline.

Wall and Ceiling Clearances

Direct Vent Only

 

 

 

 

D

 

 

 

 

 

 

 

 

 

 

B

C

A

A: Rear Wall

4” (102 mm)

B: Min. Clearance

44” (1118 mm)*

C: Min. Alcove Height

72”

(1830 mm)*

D: Max. Alcove Depth

48”

(1220 mm)

Sidewall Clearance

6” (150 mm)

*needed for installing DuraVent Minimum Vent Kit #2792 or

CFM Corporation Minimum Vent Kit #7TFSMSK.

ST101b

 

Fig. 6 Dimensions and clearances to ceiling or alcove.

Hearth Requirements

The Radiance Heater must be installed on rigid flooring. When the heater is installed directly on any combustible surface other than wood flooring, a metal or wood panel extending the full width and depth of the unit must be used as the hearth. There are no other hearth require- ments.

66

20012697

Page 6
Image 6
Vermont Casting RADVTCBD, RADVTMB Parallel Installation Minimum Clearance and Flue Centerline, Wall Centerline from Floor