|
|
|
10 | Bottom Section | |
| ||
|
|
|
Tools Needed: | Center the bottom section in the door | |
| ||
Level | opening. Level section using wooden | |
| shims (if necessary) under the bottom | |
| section. |
Level
BOTTOM SECTION
Wood shims
(if necessary)
11 |
|
|
| vertical track |
| |
|
|
|
|
| ||
| Vertical Track | fLAGANGLE |
|
|
| BOTTOM SECTION |
|
|
|
|
|
| |
Tools Needed: | IMPORTANT: The tops of the |
|
|
|
|
|
3/16” Drill Bit | vertical tracks must be level |
|
|
|
|
|
Power Drill | from side to side. If the bottom |
|
|
|
|
|
section was shimmed to level it. |
|
|
| 5/8” |
| |
7/16” Socket |
|
| roller |
| ||
The vertical track on the shimmed |
|
|
| |||
|
|
|
| |||
Driver | side, must be raised the height of |
|
|
|
|
|
Tape Measure | the shim. |
|
|
|
|
|
Level | Position the left hand vertical track | VERTICAL | 5/16” x |
|
| LAG |
| assembly over the rollers of the bottom |
|
| |||
Step Ladder | TRACK | LAG |
| |||
section. Make sure the counterbalance |
| SCREW | ||||
| ASSEMBLY | SCREWS | SCREW |
| ||
|
| locations | ||||
| cable is located between the rollers |
|
| locations |
| |
|
|
|
|
| ||
| and the door jamb. Drill 3/16” pilot |
|
|
|
|
|
| holes into the jambs for the lag | JBUS JAMB |
|
|
|
|
| screws. Loosely fasten jamb brackets |
|
|
|
| |
| BRACKET |
| 12r qi flagangle | 15r qi flagangle | ||
| and flagangle to the jamb using |
| ||||
|
|
|
|
| quick install | |
| 5/16” x |
|
|
|
| |
| Q.I. JAMB |
|
|
| jamb bracket | |
| screw securing bottom jamb bracket to |
|
|
|
| |
| BRACKET |
|
|
|
| |
| jamb, to maintain 5/8” spacing. Hang |
|
|
|
| |
|
|
| LAG |
|
| |
| cable drum over flagangle. |
|
|
|
| |
|
|
| SCREW |
|
| |
| Repeat for the right hand side. |
|
| locations |
|
|
|
|
|
|
|
| |
|
|
| BOTTOM |
|
| lag |
|
|
| 12r & 15r Fully | screw | ||
|
|
| SECTION | |||
|
|
| Adjustable flagangle |
|
14
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at