Installation
Begin the installation of the door by checking the opening. It must be the same size as the door. Vertical jambs must be plumb with header. Side clearance, from edge of door to wall, must be a minimum of
IMPORTANT: Stainless steel or PT 2000 coated lag screws MUST be used when installing center bearing brackets, end brackets, jamb brackets, operator mounting/support brackets and disconnect brackets on treated lumber
NOTE: It is recommended that 5/16” lag screws be pilot drilled using a 3/16” drill bit prior to fastening.
1 | Attaching Quick Install Flag | QUICK INSTALL TAB UNLOCKED | QUICK INSTALL TAB LOCKED |
| |||
|
|
| |
| Angles to Vertical Tracks |
|
|
Tools Needed: | NOTE: If you have fully adjustable |
|
|
None | flagangles, skip this step and complete |
|
|
| Step 2. |
|
|
| Place the lower quick install tab of the |
|
|
| flagangle in the quick install feature of | FLAGANGLE | FLAGANGLE |
| the vertical track. Give the flagangle 1/4 |
|
|
| turn to lock in place. Repeat for other |
|
|
| side. |
|
|
| NOTE: After completing this step, |
|
|
| continue with Step 3. |
|
|
|
| VERTICAL | VERTICAL |
|
| TRACK | TRACK |
|
| left hand track and flagangle | right hand track and flagangle |
|
|
| 7 |
INSTALLATION
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at