|
| |
15 | Top Section | |
| ||
|
| |
Tools Needed: | Place the top section in the opening. | |
Hammer | Temporarily secure the top section by | |
Step Ladder | ||
driving a nail in the header near the | ||
| ||
| center of the door and bending it over | |
| the top section. | |
| Now, flip up hinge leafs, hold tight | |
| against section, and fasten center | |
| hinges first, and end hinges last. (Refer | |
| to Step 12). | |
| Position flagangle between | |
| (43 mm) to | |
| edge of the door; tighten the bottom | |
| lag screw. Flagangles must be parallel | |
| to the door sections. Repeat for | |
| opposite side. | |
| IMPORTANT: THE DIMENSION | |
| BETWEEN THE FLAGANGLES MUST BE | |
| DOOR WIDTH PLUS | |
| ||
| DOOR OPERATION. | |
| Complete the vertical track installation | |
| by securing the center jamb bracket(s) | |
| and tightening the other lag screws. | |
| Repeat for opposite side. | |
|
|
door width +
NAIL
top section
top
SECTION
FLAGANGLE
INSTALLATION
17
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at