15 | Torsion Spring Assembly |
|
|
|
|
|
| Right hand cable |
|
|
|
|
|
|
| ||
|
|
|
|
|
|
| drum black | |
Tools Needed: | Important: right and left hand is always |
|
|
|
|
|
|
|
determined from inside the building looking |
|
|
|
|
|
|
| |
Step Ladder |
|
|
|
|
|
|
| |
out. |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
| Note: Identify the springs provided as either right |
|
|
|
|
|
| blackside |
|
|
|
|
|
|
| wound hand | |
| hand wound (red winding cone), which goes on the |
|
|
|
|
|
| |
|
|
|
|
| hand | right | ||
| left hand side or left hand wound (black winding |
|
|
|
| |||
|
|
|
|
| Left | cone | ||
| cone), which goes on the right hand side. | Left |
|
|
| |||
|
|
|
| winding | Torsion | |||
|
|
|
|
|
|
|
| |
| Facing the inside of the door, lay the torsion tube on | hand |
|
| winding |
|
| tube |
| cable |
|
|
|
| |||
|
| red |
|
| ||||
| the floor. Lay the spring with the black color coded |
|
|
|
| |||
|
|
|
|
|
| |||
| drum red |
| wound | side |
|
|
| |
| winding cone and the black color coded cable drum, |
|
|
|
| |||
|
|
| hand | hand | Torsion |
| ||
| at the right hand end of the tube. Lay the spring with |
| left |
|
| |||
| Right |
| tube |
|
| |||
| the red color coded winding cone and the red color | cone |
|
|
| |||
|
|
|
|
| ||||
|
|
|
|
|
|
|
| |
| coded cable drum, at the left hand end of the tube. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Nylon center |
| Note: The set screws used on all torsion |
|
|
|
|
|
| bracket bushing |
| counterbalance winding cones and cable drums, are |
|
|
|
|
|
|
|
| now colored red. Do not identify right and left hand |
|
|
|
|
|
|
|
| by the set screw color. |
|
|
| Left hand wound |
|
| |
|
|
|
|
|
|
| ||
| Slide the nylon center bushing onto the torsion tube |
|
|
| Black winding cone right |
| ||
|
|
|
| hand side |
|
| ||
| followed by the springs and cable drums. The nylon |
|
|
|
| Right hand | ||
|
|
|
|
|
|
| ||
| center bushing, springs and cable drums must be |
|
|
|
|
|
| |
|
|
|
|
|
|
| cable drum | |
| positioned, as shown. | Right hand wound |
|
| ||||
|
|
| black | |||||
|
| Red winding cone |
|
| ||||
| With assistance, pick up the torsion assembly and | Nylon center | ||||||
| Left hand side |
| bracket | |||||
| slide one end of the tube through one end bearing |
|
|
|
|
| bushing | |
| bracket. Lay the torsion tube into the center bearing | Left hand cable |
|
| Torsion |
|
|
|
| bracket and slide the other end of the tube into the | drum red |
|
|
|
|
| |
| opposite end bearing bracket. Position the torsion |
|
|
| tube |
|
|
|
| tube so that equal amounts of the tube extend from |
|
|
|
|
|
|
|
| each end bearing bracket. |
|
|
|
|
|
|
|
|
|
|
| Equal |
|
|
|
|
|
|
| spacing |
|
|
|
| |
|
|
|
|
|
| Center |
|
|
|
|
|
|
|
| bracket |
|
|
|
|
| Torsion |
|
|
|
| |
|
|
| assembly |
|
|
|
| |
|
|
|
|
|
|
| Torsion | |
|
|
|
|
|
|
| assembly | |
|
|
|
|
| End |
|
|
|
|
|
|
|
| bearing |
|
|
|
|
|
|
|
| bracket |
|
|
|
16 |
|
|
|
|
|
|
|
|
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at