Weil-McLain 550-110-260/02002 Boiler Manual, Room Air Openings, Direct exhaust vent installation

Models: 550-110-260/02002

1 60
Download 60 pages 48.89 Kb
Page 11
Image 11
Room Air Openings

Boiler Manual

Figure 3 Sizing air openings for CGs installations

Room Air Openings

Required area of the air openings given in this table are free area — after the correction for louver obstruction. (See Exception below.)

Apply this table only to installations with clearances no smaller than those shown in Figure 1, page 7 of this manual.

For installations with clearances less than shown in Figure 1, page 7 of this manual, provide 2 openings, each with 1 square inch of free area per 1,000 Btuh of total input of all appliances.

Direct exhaust vent installation

Direct vent installation

(CGs using room air for combustion)

(combustion air piped to CGs)

 

Combustion

Combustion

 

air piping

air piping

Other

Other

 

appliances

appliances

 

CGs

CGs

CGs

CGs

Room shared

CGs alone

Room shared

CGs alone

with other appliances

in room

with other appliances

in room

2 Openings —

2 Openings —

2 Openings —

NO Openings are

each opening:

each opening:

each opening:

needed, provided:

A Air from Inside

12”

Max

 

CGs

12”

Max

Air

opening

Inside

Outside

Air

opening

1 square inch

1 square inch

1 square inch

 

free area per

free area per

free area per

Clearance around

1,000 Btuh input of

4,000 Btuh input

1,000 Btuh input of

boiler is NO LESS

than shown in

other appliances

of CGs

other appliances

Figure 1, page 7

plus CGs

 

only (not CGs)

 

of this manual.

2 Openings —

2 Openings —

2 Openings —

NO Openings are

BAir Directly from Outside

CGs

12”

Max

Air

opening

Outside

Air

opening

12”

Max

each opening:

each opening:

each opening:

needed, provided:

1 square inch

1 square inch

1 square inch

 

free area per

free area per

free area per

Clearance around

4,000 Btuh input of

4,000 Btuh input

4,000 Btuh input of

boiler is NO LESS

than shown in

other appliances

of CGs

other appliances

Figure 1, page 7

plus CGs

 

only (not CGs)

 

of this manual.

2 Openings —

2 Openings —

2 Openings —

NO Openings are

each opening:

each opening:

each opening:

needed, provided:

C Air from Outside

12”

 

 

 

 

 

Max

 

 

Through horizontal

Air

ducts

opening

Duct

 

Inside

Outside

1 square inch

1 square inch

1 square inch

 

free area per

free area per

free area per

Clearance around

2,000 Btuh input of

4,000 Btuh input

2,000 Btuh input of

boiler is NO LESS

CGs

Air

opening

12”

Max

Duct

other appliances

of CGs

other appliances

than shown in

Figure 1, page 7

plus CGs

 

only (not CGs)

 

of this manual.

Outside or ventilated attic

DAir from Outside or Attic — Lower Opening in Floor

or Vertical Duct

 

Duct

Outside

CGs

12”

 

 

 

 

 

 

 

Max

Or

 

 

 

 

Ventilated

 

 

 

crawl space

 

 

 

26007

 

 

 

2 Openings —

2 Openings —

2 Openings —

NO Openings are

each opening:

each opening:

each opening:

needed, provided:

1 square inch

1 square inch

1 square inch

 

free area per

free area per

free area per

Clearance around

4,000 Btuh input of

4,000 Btuh input

4,000 Btuh input of

boiler is NO LESS

than shown in

other appliances

of CGs

other appliances

Figure 1, page 7

plus CGs

 

only (not CGs)

 

of this manual.

Exception to combustion air opening rules:

NO combustion air openings are needed when the boiler (and other appliances) are installed in a space with a volume NO LESS than 50 cubic feet per 1,000 Btuh of all installed appliances. Sum the total input of all appliances in MBH (1,000's of Btuh) and multiply this number times 50. Building must not be of Tight construction (see page 10).

Example: For total input of 100 MBH (100,000 Btuh), minimum volume is 50 x 100 = 5,000 cubic feet. At a ceiling height of 8 feet, space must have at least 5,000 ÷ 8 = 625 square feet (25 feet x 25 feet, for instance).

Part number 550-110-260/0200

11

Page 11
Image 11
Weil-McLain 550-110-260/02002 Boiler Manual, Room Air Openings, Direct exhaust vent installation, Direct vent installation