Nortel Networks DCT1900 manual Installation of Cables, CLU/SLU to the MDF

Models: DCT1900

1 400
Download 400 pages 50.54 Kb
Page 278
Image 278

Technical Product Manual - DCT1900

Installation Instructions, Modular Cabinet – CLU/SLU to Base Station Cabling

21.2Installation of Cables

Note:

Base Stations with cables longer than 1.3 miles up to 2.17 miles must always be connected to a CLU with product code REX-BRD0014 or ROFNB 157 11/2.

Base Station with cables of up to 1.3 miles can be connected to a CLU/SLU with product code REX-BRD0014 (ROFNB 157 11/2) or REX-BRD0015 (ROFNB 157 16/1) or REX-BRD0016 (ROFNB 157 16/2).

CLU/SLU to the MDF

Cable sets NTM/TSRNB 101 29 and NTM/TSRNB 101 46 connect from the CLU/SLU boards in the modular cabinet to 66 blocks (or equivalents) on the MDF. Refer to the Table 21-2 and 21-3 for the pinout of the respective cables.

1.Connect the plug of CLU/MDF cable TSRNB 101 29/2 (or the long cable TSRNB 101 46/2) to the upper connector of the furthest right CLU or SLU as shown in Fig. 21–2.

2.Connect the plug of CLU/MDF cable TSRNB 101 29/1 (or the long cable TSRNB 101 46/1) to the lower connector of the same CLU or SLU as in the previous step.

3.Screw the shielding clamp of TSRNB 101 29/2 (or TSRNB 101 46/2) to the furthest right free position on the ground strip using two M3 x 10 torx screws delivered with the Modular Cabinet.

4.Screw the shielding clamp of TSRNB 101 29/1 (or TSRNB 101 46/1) to the next furthest right free position on the ground strip.

5.Connect the cable set TSRNB 101 29 to the provided 66 blocks via the 25 pair amphenol connector. Connect the cable set TSRNB 101 46 to the provided 66 blocks, or any other block by punching the wires down. Circuit wiring is shown in Table 21-2.

Note:

To meet EMC requirements, the cable should never be cut to a length shorter than 8.20 ft.

21-2

Install-DCT1900/R8/mw

 

© 2000-2005

Page 278
Image 278
Nortel Networks DCT1900 manual Installation of Cables, CLU/SLU to the MDF