Installation Instructions, Base Station – KRC 101 1371

1:Small link chain, white or unpainted depending on ceiling color. Purchased at Home Depot (or similar store). TYPICAL (2) 6 foot lengths.

2:1/8" Quick Link. Manufacturer - Campbell, p.n. 764-5106, quantity of 4. Purchased at Home Depot.

3:#8 Screw Eye - Quantity of 4. Purchased at Home Depot.

4:5.5" x5" piece of 3/4" thick Melamine. Purchased at Home Depot and cut to size.

5: DCT1900 Base Station -DB600-001 .

3

6:DCT1900 Right Angle Antenna Set - KRE 101 1750/55 - quantity of 1.

7:Base Station cable connected to RJ45.

6

Fig. 16-10 Mounting to Factory Ceiling

The chain is to be used as two continuous pieces. Loop the chains around the I Beam and connect them to the screw eyes with the Quick Links. (See Figure 16-10.)

Always use right angle antennas.

Once the Base Station is mounted and the cable is connected to the base station, make sure that the Base Station cable is tie wrapped to one of the chains. This acts as a retention device so that the Base Station does not slide off of the mounting bracket.

See Figure 16-11 for screw mounting dimensions.