Technical Product Manual - DCT1900

Installation Instructions, Modular Cabinet – DLU Cabling

24.3Connection to PBX’s

Connecting the DLUs to the PBX

1.Screw the shielding clamp of AWS1019 to the furthest left free position on the ground strip using two M3 x 10 torx screws delivered with the Modular Cabinet.

2.Connect the RJ-45 terminated end of the DLU cable by matching the labeled terminations with the corresponding board position indicated in Fig. 24-2.

3.Connect the male AMP connector to the 66 block.

4.If 66 blocks are not permissible in the switch room due to preference or standardization practices the AMP connector may be cut off and the cable may be punched down in standard telecom color code. See Table Fig. 24-1 for the pinout of the AWS1019 DLU/MDF Cable.

Install-DCT1900/R8/mw

24-3

© 2000-2005

 

Page 299
Image 299
Nortel Networks DCT1900 manual Connection to PBX’s