Technical Product Manual - DCT1900

Installation Instructions, Modular Cabinet – CPU Cabling

A

B

 

Cable tie blocks

Fig. 20-3 Cable Tie Blocks on the Ground Strip

Connection to the PC, Printer, and SMS System

1.Connect PC cable (TSRNB 101 22D) to the PC connector on the MCCB and to the PC.

2.Connect the printer cable (TSRNB 101 23) to the PR connector on the MCCB and to the printer. For Short Message Service (SMS), connect the printer connector on the MCCB to the RS232 on the PC running the SMS application using cable TSRNB 101 23 (DB25) or TSRNB 101 22D (DB9).

3.Fasten the cables to the cable tie blocks on the ground strip (see Figure 20–3) using tie wraps.

20-4

Install-DCT1900/R8/mw

 

© 2000-2005

Page 268
Image 268
Nortel Networks DCT1900 manual Cable Tie Blocks on the Ground Strip, Connection to the PC, Printer, and SMS System