Technical Product Manual - DCT1900

Installation Instructions, Cell Link Unit (CLU) – REX-BRD0014 or ROFNB 157 11/2

Power from

MCCB

Base Station 8

P0

P1

SC0

SC1

EPP0, 1

Fuse

CLU

CLC 8

SC0

Base Station 1

SC1

EPP0, 1

CLC 1

Fig. 7–2 Power Distribution on the CLU

7.3Installation

1.Insert the CLU into the card guides in the specified slot position.

2.Gently push the board into the back connector until it locks. Don’t use any force.

3.Connect the CLU power cable, TSRNB 101 33.

4.Connect the CLU signal cable, NTM/TSRNB 101 29.

Install-DCT1900/R8/mw

7-3

© 2000-2005

 

Page 193
Image 193
Nortel Networks DCT1900 manual Power Distribution on the CLU