Nortel Networks DCT1900 manual Installation of the Modular Cabinets

Models: DCT1900

1 400
Download 400 pages 50.54 Kb
Page 157
Image 157

Technical Product Manual - DCT1900

Installation Instructions, or BDVNB 101 01/3

Ceiling

Cabinet 3 (Cabinet 4)

Mounting Bracket

 

 

minimum

 

 

Approx.

 

4 in

 

 

1 3/4 in

 

 

Approx.

 

 

 

 

3 3/4 in

6 1/2 in

 

 

Cabinet 1

 

Cabinet 2

Cabinet 4

15 3/8"

(Cabinet 3)

 

(Cabinet 1)

(Cabinet 2)

 

 

8 7/8 in

 

 

 

 

1/8 in

x d x 1/4 in

 

5.25 ft

 

 

 

 

 

42 in

Floor

Notes:

The mounting brackets are drawn above the cabinets. When the cabinets are mounted to the wall, the mounting brackets are not visible.

An alternative cabinet numbering is given between parentheses.

A typical sheet of plywood (48” wide) will hold all four cabinets.

All cable entrances are from the bottom.

The cabinet with the CPU board is always cabinet 1.

Fig. 4-1 Installation of the Modular Cabinet(s)

Install-DCT1900/R8/mw

4-3

© 2000-2005

 

Page 157
Image 157
Nortel Networks DCT1900 manual Installation of the Modular Cabinets