Nortel Networks DCT1900 manual Mounting the Modular Cabinets to the Wall, Torx screwdriver nr

Models: DCT1900

1 400
Download 400 pages 50.54 Kb
Page 163
Image 163

Technical Product Manual - DCT1900

Installation Instructions, or BDVNB 101 01/3

zSync port installation set: NTMNB 101 107

-SDB

-Two spacers

-Two spring washers

zTorx screwdriver nr. 20

Follow the next steps for mounting the SDB:

1.Unscrew the left fixation screw of the mains switch bracket (refer to Figure 4–2 for the location and orientation).

2.Insert a spacer in the left side screw hole and tighten the spacer using a Torx screwdriver.

3.Repeat steps 1 and 2 for the right side screw.

4.Mount the SDB as indicated in Figure 4–7 and tighten screws (maximum torque 0.59 lb./ft.).

Bottom plate

Modular Cabinet

Spacer

SDB

Spring washer

Torx screw

Fig. 4–7 Mounting of the Synchronization Distribution Board

4.8Mounting the Modular Cabinet(s) to the Wall

1.Hang the Modular Cabinet(s) up using the mounting bracket(s). In a multi cabinet configuration, the cabinets must be placed against each other, so that the shielding gasket will always make good contact with each other.

2.Secure the cabinet(s) to the wall by inserting and fastening the screws at the bottom of the cabinet(s).

Install-DCT1900/R8/mw

4-9

© 2000-2005

 

Page 163
Image 163
Nortel Networks DCT1900 manual Mounting the Modular Cabinets to the Wall, Sync port installation set Ntmnb 101