Nortel Networks DCT1900 manual Evaluation, Display Layout MER Test

Models: DCT1900

1 400
Download 400 pages 50.54 Kb
Page 337
Image 337

Technical Product Manual - DCT1900

Commissioning, Radio Coverage Verification

DISPLAY LAYOUT MER TEST

[Frame Count] [Total Frames or MER] [SYNC] [A-CRC] [X-CRC]

[1.] Frame Count

The frame count field contains a running counter of the number of frames that have been examined.

[2.] Total Frames or MER

When a test is in progress this field contains the total number of frames for which the test will run. At the completion of a test this field contains the message error rate (PERCENTAGE).

[3.] SYNC

This field contains the number of SYNC errors encountered.

[4.] A-CRC

This field contains the number of A-CRC errors encountered.

[5.] X-CRC

This field contains the number of X-CRC errors encountered.

7.Monitor the frame counter if the walk around takes more than 10 minutes. Record the results of each 10-minute test and restart the test. If the walk around takes less than 10 minutes continue to walk the coverage area until the 10 minutes are up.

8.To be good, the average MER percentage should be no more than 1.00%

9.Watch out for the 5-minute SPU timer. (Keep talking).

10.Upon completion of the test exit DCA mode and power off the phone.

(DO NOT LEAVE THE PHONE IN DCA MODE)

4.5Evaluation

After having performed the Base Station test and the area coverage test, the results should be evaluated. If the coverage is not sufficient you should review the Base Station plan and move or add Base Stations.

Comm-DCT1900/R8/mw

4-3

© 2000-2005

 

Page 337
Image 337
Nortel Networks DCT1900 manual Evaluation, Display Layout MER Test