Technical Product Manual - DCT1900

Installation Instructions, Cell Link Unit (CLU-S) –REX-BRD0016 or ROFNB 157 16/2

Power from

MCCB

Base Station 8

Base Station 1

P0

P1

SC0

SC1

EPP0, 1

SC0

SC1

EPP0, 1

Thermistor

+T

+T

+T

+T

CLU-S

CLC 8

CLC 1

Fig. 8–2 Power Distribution on the CLU-S

8.3Installation

1.Insert the CLU-S into the card guides in the specified board position.

2.Gently push the board into the back connector until it locks. Don’t use any force.

3.Connect the CLU power cable, TSRNB 101 33.

4.Connect the CLU signal cable, NTM/TSRNB 101 29.

Install-DCT1900/R8/mw

8-3

© 2000-2005

 

Page 197
Image 197
Nortel Networks DCT1900 manual Power Distribution on the CLU-S