Nortel Networks DCT1900 manual Base Station Mounting to Factory Ceiling I Beams

Models: DCT1900

1 400
Download 400 pages 50.54 Kb
Page 232
Image 232

Technical Product Manual - DCT1900

Installation Instructions, Base Station – KRC 101 1371

6.Screw in the two 1/4-20 screws with the captured star washers as shown. Check that the assembly is locked to the base station.

Fig. 16-9 Inserting Washers into Ceiling Bracket

7. Twist the ceiling clips clockwise and then back counterclockwise onto the ceiling grid.

16.6.3Base Station Mounting to Factory Ceiling (I Beams)

Direct mounting of the DCT1900 Base Station to an I beam in the ceiling is not allowed because of the distortion caused to the radiated field pattern of the Base Station. Included in the following discussion is a recommended method of securing the Base Station to the overhead while not affecting the Base Stations’ radiation pattern.

16-10

Install-DCT1900/R8/mw

 

© 2000-2005

Page 232
Image 232
Nortel Networks DCT1900 manual Base Station Mounting to Factory Ceiling I Beams