Technical Product Manual - DCT1900

Installation Instructions, Modular Cabinet – Power Cabling

CHAPTER 19

Modular Cabinet – Power Cabling

19.1 Introduction

This chapter describes the installation of the power cables in two different versions of the Modular Cabinet. The installation depends on the number of external -48Vdc power supplies and on how the Base Stations are powered.

WARNING

Disconnect or switch off all power supply sources before servicing any power

supply circuit.

19.2 Modular Cabinet - BDVNB 101 01/3 (R2, R3)

Fig. 19–1 shows the power distribution in a Modular Cabinet powered by external -48Vdc supplies.

MODULAR

 

 

 

BACKPLANE

 

 

CABINET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

X102

48 Vdc

+ 5 V

To

 

 

 

 

 

+ 12 V

System

Terminal

 

A

 

 

 

* 12 V

Boards

 

 

 

 

 

 

TERMINAL BLOCK

 

 

 

 

 

Block A

 

 

 

 

 

 

 

(SEE

FIG. 19-2)

 

 

 

 

X112, X113

 

(see

 

 

 

 

 

 

 

 

 

 

TRENB

 

 

Piggy-back

 

External -48Vdc

Mains

 

 

or

 

FASTON

 

 

 

101 05

 

 

 

 

filter

 

 

15 A

 

TRENB

TSRNB

 

 

 

 

 

 

 

 

 

 

 

101 03

101 33

Terminal

B

MCCB

 

PW-BP

PW1

 

TERMINAL BLOCK

 

 

 

 

 

Block B (see

 

 

 

 

 

PW2

 

(SEE FIG. 19-2)

 

 

 

 

 

 

 

 

 

 

 

 

 

PW3

 

External -48Vdc

 

 

 

 

F1

 

PW1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15 A

 

PW2

To

 

 

 

 

 

 

 

PW7

 

 

 

 

 

 

 

CLUs

 

PW-EXT

 

 

F2

 

 

 

 

 

 

PW3

 

 

 

 

 

 

 

 

 

 

 

 

 

15 A

 

PW4

 

 

 

 

 

 

 

 

PW5

 

 

 

 

 

 

 

 

PW6

 

Fig. 19-1 Power Distribution Powered by External -48Vdc

Install-DCT1900/R8/mw

19-1

© 2000-2005

 

Page 251
Image 251
Nortel Networks DCT1900 manual Modular Cabinet Power Cabling, Modular Cabinet Bdvnb 101 01/3 R2, R3