Technical Product Manual - DCT1900

Installation Instructions, Modular Cabinet – Installation Steps

Note:

The board position label should not be placed on the leading edge at the top of the cabinet for this will isolate the enclosure EMI shielding.

24

28

32

36

40

44

48

52

56

Board Position label

Fig. 3–2 Position of the Board Position Label

3.9Cabinet Number Labels, Board Name Labels and Cable Position Labels

Label each item with the corresponding label after installation is completed. Labelling cables is important to avoid misconnection of cables after maintenance has been carried out.

The cable position labels indicate the board position and the position of the connector where the plug is connected. Figure 3–3 gives the standard connector positions on all boards (position 1–4) and two examples of the labeling. If more than one position is used by the plug, mark the plug with the lower position used.

3-4

Install-DCT1900/R8/mw

 

© 2000-2005

Page 152
Image 152
Nortel Networks DCT1900 manual Position of the Board Position Label