Technical Product Manual - DCT1900

Commissioning, Portable Telephone Test

CHAPTER 3

Portable Telephone Test

3.1General

This test checks for a complete connection of a Portable Telephone through the DCT1900 system to the MS/PBX. Furthermore, it checks that the Portable Telephone has been correctly initialized. The test is performed by setting up and answering a call.

3.2Portable Telephone Test

1.Ensure that the Portable Telephone is initialized using the configuration tool (CSMW for Stan- dalone).

2.Switch off the Portable Telephone and move to the coverage area of the DCT1900 system to be tested with the Portable Telephone.

3.Switch on the Portable Telephone and observe if the Portable Telephone registers itself to the system.

4.Go off–hook and check for dial tone.

5.Make a call to a fixed or stationary telephone.

6.Verify CLI when available.

7.Go on–hook again and ask someone to call you.

8.Answer the call and check if the call is set–up correctly.

9.Go on–hook again and test other Portable Telephones by repeating steps 2 through 8.

10.Verify caller line ID by with an appropriate desk set.

11.Verify multiple line appearance by making multiple calls to a Portable Telephone from various extensions

12.Verify PBX feature functionality such as hold, transfer, conference, call back and reconnect.

3.3Portable Telephone Test for SMS

1.Ensure Paragraph 3.2 is done.

2.Ensure that the Radio Exchange and the external SMS source are configured for SMS.

3.Switch the Portable Telephone on and ensure it registers.

4.Referring to the SMS application documentation, send an SMS message to the Portable Telephone.

5.Look for Message ring to ensure the message was received by the Portable Telephone.

6.Select Read Message.

Comm-DCT1900/R8/mw

3-1

© 2000-2005

 

Page 339
Image 339
Nortel Networks DCT1900 manual Portable Telephone Test for SMS